1 | TO SUPPLY LABOUR AND MATERIALS TO NEW INSTALL | 16.00 | 28,500.00 | 456,000.00 | Edit | Delete | | MIDEA VRF MIDEA -20HP 1TO1 CEINING DUCTED UNIT
MODEL:MVC-M560WV2GN1(G)
MIH560T1HN18
*INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
WATER PIPE 16MM-25MM; AND ALL NECESSARY PARTS
TESTING $ COMMISSIONING APPLIED.
*WARRANTY FOR NEW AIRCON
*1 YEAR SPARE PARTS
*5 YEARS COMPRESSOR
**EXCLUDE AIRCON BRACKET FOR VRF
**EXCLUDE SUBMISSION
| 2 | TO SUPPLY AND INSTALL WATE TARY FOR INDOOR UNIT | 16.00 | 380.00 | 6,080.00 | Edit | Delete | 3 | TO SUPPLY AND INSTALL WATER TARY FOR OUTOOR | 16.00 | 1,500.00 | 24,000.00 | Edit | Delete | 4 | DUCTING WORK | 16.00 | 950.00 | 15,200.00 | Edit | Delete | | TO SUPPLY LABOUR AND MATERIALS TO CONNECT DUCT WORK AND FILTER .
| 5 | TO SUPPLY AND INSTALL 32A TPN ISOLATION USING 4X1C /10MM PVC CABLE +CPC | 16.00 | 2,200.00 | 35,200.00 | Edit | Delete | |
| 6 | UPDATE SLD DRAWING | 1.00 | 300.00 | 300.00 | Edit | Delete | 7 | MODIFY DB TO CATER ELECTRICAL WORK | 1.00 | 3,500.00 | 3,500.00 | Edit | Delete | 8 | LEW ENDORSEMENT FOR DRAWING | 1.00 | 800.00 | 800.00 | Edit | Delete | 9 | LEW ATTENDANCE FOR ONSITE TESTING | 1.00 | 1,200.00 | 1,200.00 | Edit | Delete | 10 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL | 16.00 | 1,200.00 | 19,200.00 | Edit | Delete | | OUTDOOR DUCTED ELBOW .
**OUTDOOR LOCATION IS WITHIN THE UNIT ,DUCTING TO LEAD THE HOT AIR OUT OF THE BUILDING.
| 11 | SCISSOR LIFT BOOKING | 2.00 | 950.00 | 1,900.00 | Edit | Delete | 12 | REMARKS | | | | Edit | Delete | | 1) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 10%FULL PAYMENT UPON JOB COMPLETED.
4) EXCLUSION: WORKS NOT STATED ABOVE. | Total | 102.00 | | 563,380.00 |