No
|
Product
|
Quantity
|
Unit Price
|
Amount
|
Function
|
1 | FOR L3 CU6 | 1.00 | 61,700.00 | 61,700.00 | Edit | Delete | | TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL
DAIKIN VRV A SERIES INVERTER R410A GAS
MODEL: RXQ44AMYMG(RXQ12AYMG+RXQ12AYMG+RXQ20AYMG)
FCU-MODEL:FXMQ250MVE9 (WIRELESS DUCTED WITHOUT DRAIN PUMP)X4 -28.0KW
FCU-MODEL:FXFQ50AVM (W) CASSETTE X2 (5.6KW)
| 2 | FOR L2 SANCTUARY CU-8 | 1.00 | 48,900.00 | 48,900.00 | Edit | Delete | | TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL
MODEL:RXQ32AMYMG(RXQ14AYMG+RXQ18AYMG)
FCU-MODEL:FXMQ200MVE9(WIRELESS DUCTED WITHOUT DRAIN PUMP)X4 (28.0KW)
| 3 | FOR 2ND STOREY AND 3RD STOREY CU-3 | 1.00 | 80,900.00 | 80,900.00 | Edit | Delete | | TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL
MODEL:RXQ50AMYMG(RXQ14AYMG+RXQ18AYMG+RXQ18AYMG)
FCU:FXMQ200MVE9(WIRELESS DUCTED WITHOUT DRAIN PUMP)X4 (28.0KW)
FCU:FXFQ32AVM(W) CASSETTE X1 (3.6KW)
FCU-FXFQ50AYM(W) CASSETTE X4 (5.6KW)
**THE EXISTING COPPER PIPE AT THE RISER EXIT ON THE SECOND FLOOR WILL BE CUT AND RECONNECT TO THE NEW MAIN PIPING . AND ALL NECESSARY PARTS.
TESTING $ COMMISSIONING APPLIED.
**USE BAY PVC WATER PIPE
WARRANTY FOR NEW AIRCON
*1 YEAR SPARE PARTS
*5 YEARS COMPRESSOR
**EXCLUDE AIRCON BRACKET FOR VRF
**EXCLUDE SUBMISSION
| 4 | TO SUPPLY AND INSTALL MAIN PIPE FOR CU6/CU8/CU3 | 3.00 | 4,650.00 | 13,950.00 | Edit | Delete | |
| 5 | DUCTING WORK | 12.00 | 1,340.00 | 16,080.00 | Edit | Delete | | TO SUPPLY LABOUR AND MATERIALS TO CONNECT DUCT WORK . | 6 | TO SUPPLY AND INSTALL FILTER | 12.00 | 290.00 | 3,480.00 | Edit | Delete | 7 | *CRANE BOOKING (IF ANY) $2800/1DEY | 1.00 | 2,800.00 | 2,800.00 | Edit | Delete | 8 | TO SUPPLY LABOUR DISMANTLE 3SET VRV A/C TAKE BACK, DISPOSE | 3.00 | 1,550.00 | 4,650.00 | Edit | Delete | 9 | REMARKS | | | | Edit | Delete | | 1) 50% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 30% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 20%FULL PAYMENT UPON JOB COMPLETED.
4) EXCLUSION: WORKS NOT STATED ABOVE. | Total | 34.00 | | 232,460.00 |
10 |
|
|
|
|
|
|
|
|