Kaili Aircond
Singapore


Online Billing Portal
Cloud Solutions Sdn Bhd
Vince : +6012 7040 900 ( watapps / wechat )
[email protected]

   File Attachement   Create Revised Copy
Customer Information
Branch Last Update SUN   
Name Quotation No Q
Running Reference : Q25/0314
Address Customer No
Address 2
Address 3
Address 4
Contact Tel Fax
Quotation Information
Date
    
Ref
Validity Delivery Terms
Subject
Currency Remark
      
Quotation Detail Information
No Product Quantity Unit Price Amount Function
1TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL:1.00155,000.00155,000.00 Edit Delete
 MITSUBISHI ELECTRIC VRF (INVERTER R410GAS
CU1: PUCY-EP1100YSKE(PUCY-EP350YKE+PUCY-EP350YKE+PUCY-EP400YKE)
FCU-PKFY-P63VKM-E-TH(W) 24K WALL *2 (LEVEL1)
FCU-PLFY-P100VEM-PA(W) 36K C/C *4 (LEVEL2)
FCU-PLFY-P63VEM-PA(W) 24K CC *2 (LEVEL2)
FCU-PLFY-P100VEM-PA(W) 36K C/C *4 (LEVEL3)
TOTAL 12NOS FCU



CU2: PUCY-EP1100YSKE(PUCY-EP350YKE+PUCY-EP350YKE+PUCY-EP400YKE)
FCU-PKFY-P50VKM-E-TH(W) 18K WALL *1 (LEVEL1)
FCU-PEFY-P100VMA-E (W) 36K DUCTED *2 (1 STSTOREY )
FCU-PKFY-P63VKM-E-TH(W) 24K WALL *1 (1 ST STOREY)
FCU-PLFY-P100VEM-PA(W) 36K C/C *4 (2 ST STOREY)
FCU-PLFY-P63VEM-PA(W) 24K CC *1 (LEVEL3)
TOTAL 13NOS FCU

**INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
WATER PIPE 16MM-25MM; CABLE TRAY AND ALL NECESSARY PARTS.
**INCLUDE CONCEAL
TESTING $ COMMISSIONING APPLIED.

*WARRANTY FOR NEW AIRCON
*1 YEAR SPARE PARTS
*5 YEARS COMPRESSOR

**EXCLUDE AIRCON BRACKET FOR VRF
**EXCLUDE SUBMISSION
2DUCT WORK FOR 36K DUCTED FCU 2.004,800.009,600.00 Edit Delete
 TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.
INCLUDE FILTER AND WATER TARY AND ALL NECESSARY PARTS.
3*CRANE BOOKING (IF ANY) $2300/1DEY1.002,300.002,300.00 Edit Delete
4TO SUPPLY AND INSTALL EXHAUST FAN 6.001,400.008,400.00 Edit Delete
 ODEL:GCIL100
FABRICATE MAIN DUCT , MATERIAL USED; PU FOAM,C/W FOUR WAY GRILL FLEXIBLE AND NECESSARY ACCESSRIES
FOR MAIDS ROOM
BATH1-BATH4
KITCHEN
5 DRAWING 1.001,800.001,800.00 Edit Delete
6 REMARKS    Edit Delete
 1) 50% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 30% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 20%FULL PAYMENT UPON JOB COMPLETED.
4) EXCLUSION: WORKS NOT STATED ABOVE.
Total11.00 177,100.00
7