						No
					 | 
					
						Product
					 | 
					
						Quantity
					 | 
					
						Unit Price
					 | 
					
						Amount
					 | 
					
						Function
					 | 
				 
				| 1 | TO SUPPLY AND INSTALL 1 LOT OF CHILLED WATER PIPING C/W NECESSARY ACCESSORIES .  | 1.00 | 9,800.00 | 9,800.00 |   Edit |   Delete |  |   | * BALANCING VALVE , MOTORISED VALVE , GATE VALVE , PRESSURE GAUHE (IN / OUT) (100METER )  |  | 2 | TO SUPPLY AND INSTALL ONE NOS 18K chill water CEILING DUCTED .  | 1.00 | 4,500.00 | 4,500.00 |   Edit |   Delete |  | 3 | TO SUPPLY LABOUR MATERIAL AND TOOL TO DO 2 SETS  HOT TAPPING PIPELINE   | 1.00 | 1,800.00 | 1,800.00 |   Edit |   Delete |  | 4 | TO SUPPLY AND INSTALL 1 NOS METER AHU ROOM EQUIPMENT .  | 1.00 | 1,300.00 | 1,300.00 |   Edit |   Delete |  | 5 | TO SUPPLY LABOUR MATERIAL AND TOOL TO  INSTALL 2 PCS OF LINEAR BOX AND CONNECT BACK THE EXITING DUCT | 1.00 | 3,800.00 | 3,800.00 |   Edit |   Delete |  |   | WORK .  |  | 6 | TO SUPPLY LABOUR AND MATERIAL TO INSTALL ONE LOT OF NEW JACKETING PIPING .  | 1.00 | 1,500.00 | 1,500.00 |   Edit |   Delete |  | 7 | PE ENDORSEMENT AND AIRFLOW BALANCING  WITH HEATLOAD CACULATORSUBMISSION | 1.00 | 1,800.00 | 1,800.00 |   Edit |   Delete |  | 8 | TERM OF PAYMENT  |   |   |   |   Edit |   Delete |  |   | 1) 50% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
 2) 30% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
 3) 20%FULL PAYMENT UPON JOB COMPLETED.
 4) EXCLUSION: WORKS NOT STATED ABOVE. |  | 9 | DISCOUNT  |   | 1,500.00 |   |   Edit |   Delete |  | Total | 6.00 |   | 23,000.00 |  				
					| 
						10					 | 
					
						
												  
						 	
					 | 	
					
											 | 
					
											 | 
					
					 | 
				 
				
				
					| 
					 | 
					
											 | 
				 
				
					| 
												  
											 | 
				 	
							 
		 |