Kaili Aircond
Singapore


Online Billing Portal
Cloud Solutions Sdn Bhd
Vince : +6012 7040 900 ( watapps / wechat )
[email protected]

   File Attachement   Create Revised Copy
Customer Information
Branch Last Update admin   
Name Quotation No Q
Running Reference : Q23/1211
Address Customer No
Address 2
Address 3
Address 4
Contact Tel Fax
Quotation Information
Date
    
Ref
Validity Delivery Terms
Subject
Currency Remark
      
Quotation Detail Information
No Product Quantity Unit Price Amount Function
1 BASEMENT1.004,380.004,380.00 Edit Delete
 TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL
DAIKIN INVERTER WALL 1TO2
MODEL:MKM75VVMG + CTKM35VVMG + CTKM50VVMG
18000BTU FOR FAMILROOM
12000BTU FOR WINE CELLAR
2LEVEL 12.005,580.0011,160.00 Edit Delete
 TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL
DAIKIN INVERTER CEILING DUCTED
RZFC125DY1G(3ph)/FBFC125DVMG(WIRELESS/WIRED)
FOR LIVING
FOR LIVING AND DINING
3TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL1.005,500.005,500.00 Edit Delete
 DAIKIN INVERTER 1TO3 WALL
MODEL: MKM85VVMG + CTKM25VVMG X1 + CTKM35VVMG X2
12000BTU FOR GUEST LEVEL1
12000BTU BEDROOM1 LEVEL 2
90000BTU BEDROOM2 LEVEL2
4 TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL1.003,200.003,200.00 Edit Delete
 DAIKIN INVERTER 1TO1 WALL 24000BTU
MODEL:RKM71XVMG/FTKM71XVMG
FOR MASTER BEDROOM
5ATTIC2.001,780.003,560.00 Edit Delete
  TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL
DAIKIN INVERTER 1TO1 WALL
MODEL:RKM35XVMG/FTKM35XVMG
12000BTU FOR BEDROOM3
12000BTU FOR BEDROOM4
6 DUCTING WORK FOR DUCTED2.003,800.007,600.00 Edit Delete
 TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W ABS LINEAR GRILLS
FOR LEVEL 1 LIVING AND DINING
*INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
WATER PIPE 16MM-25MM; CABLE AND ALL NECESSARY PARTS.
**INCLUDE CONCEAL AND (FILTER FOR DUCTED)
TESTING & COMMISSIONING APPLIED.

K-FLEX CLASS O
~22SWG COPPER PIPE

*WARRANTY FOR NEW AIRCON
~1 YEAR SPARE PARTS
~5 YEARS COMPRESSOR

**AIRCON OUTDOOR BRACKET IF ANY)$180/1SET
**CRANE BOOKING (IF ANY)$950/1DAY
**Not include PE endorsement
7 REMARKS    Edit Delete
 1)20% DEPOSIT AFTER PIPE LAYING AND INSTALL.
2)70% SECOND PAYMENT UPON AIRCON ARRIVAL BEFORE INSTALLATION
3)10% FULL PAYMENT UPON JOB COMPLETION.
4) DELIVERY: EX-STOCK PRIOR TO SALE, OTHERWISE 1 TO 3 MONTHS FROM DATE OF PURCHASE ORDER RECEIVED.
Total9.00 35,400.00
8