						No
					 | 
					
						Product
					 | 
					
						Quantity
					 | 
					
						Unit Price
					 | 
					
						Amount
					 | 
					
						Function
					 | 
				 
				| 1 | TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL: | 1.00 | 61,900.00 | 61,900.00 |   Edit |   Delete |  |   | RXQ28AMYMG(12+16)
 FXFQ100AVM -CASSETTE X2
 FXFAQ32AVM- WALL X5
 FXFAQ50AVM-WALL  X5
 FXFAQ63AVM-WALL X1
 
 **INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
 WATER PIPE 16MM-25MM; CABLE TRAY AND ALL NECESSARY PARTS.
 **INCLUDE CONCEAL
 TESTING $ COMMISSIONING APPLIED.
 
 *WARRANTY FOR NEW AIRCON
 *1 YEAR SPARE PARTS
 *5 YEARS COMPRESSOR
 
 **CRANE BOOKING (IF ANY) $1900/1DEY
 **EXCLUDE AIRCON BRACKET |  | 2 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL MAIN PIPING C/W COPPER . | 1.00 | 3,500.00 | 3,500.00 |   Edit |   Delete |  |   | 	**not include DRAWING AND SUBMISSION |  | 3 | TO SUPPLY AND INSTALL EXHAUST AIR FOR KITCHEN | 1.00 | 1,800.00 | 1,800.00 |   Edit |   Delete |  |   | FABRICATE EXHAUST DUCT , MATERIAL USED; PU FOAM, C/W FOUR WAY GRILL ,FLEXIBLE AND NECESSARY ACCESSRIES
 *does not include kitchen hood |  | 4 | TO SUPPLY AND INSTALL EXHAUST AIR FOR STORAGE | 1.00 | 1,600.00 | 1,600.00 |   Edit |   Delete |  |   | FABRICATE EXHAUST DUCT , MATERIAL USED; PU FOAM, C/W FOUR WAY GRILL ,FLEXIBLE AND NECESSARY ACCESSRIES |  | 5 | 	REMARK |   |   |   |   Edit |   Delete |  |   | 1) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
 2) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
 3) 10%FULL PAYMENT UPON JOB COMPLETED.
 4) EXCLUSION: WORKS NOT STATED ABOV |  | Total | 4.00 |   | 68,800.00 |  				
					| 