Kaili Aircond
Singapore


Online Billing Portal
Cloud Solutions Sdn Bhd
Vince : +6012 7040 900 ( watapps / wechat )
[email protected]

   File Attachement   Create Revised Copy
Customer Information
Branch Last Update admin   
Name Quotation No Q
Running Reference : Q20/703
Address Customer No
Address 2
Address 3
Address 4
Contact Tel Fax
Quotation Information
Date
    
Ref
Validity Delivery Terms
Subject
Currency Remark
      
Quotation Detail Information
No Product Quantity Unit Price Amount Function
1TO SUPPLY LABOUR MATERIAL TOOLS, EQUIPMENT AND TRANSPORT THE WORKS.1.005,490.005,490.00 Edit Delete
 1) DISMANTLE AND DISPOSE OFF EXISTING FCU
2) SUPPLY AND INSTALL NEW CHILLED WATER FCU. (MODEL YDF-4R) YORL
3) TO SUPPLY AND INSTALL NEW CHW BARE PIPE 25MM.
4) TO DO PU INSULATION 1/W SHEATHED FOR ITEM NO.3.
5) DISMANTLE AND DISPOSE OFF EXISTING TRANSFORMATION DUCT.
6) DISMANTLE AND DISPOSE OFF EXISTING DRAIN PAN.
7) SUPPLY AND INSTALL NEW TRANSFORMATION DUCT.
8) DISMANTLE AND DISPOSE OF EXISTING CONDENSATE DRAINPIPE.
9) SUPPLY AND INSTALL NEW CONDENSATE DRAINPIPE 25MM C/W CLOSED CELL INSULATION.
10) SUPPLY AND REPLACE CONDENSATE DRAIN PAN C/W CLASS WOOL INSULATION.
11) SUPPLY AND INSTALL ELECTRIC MOTORIZED 2-WAY VALVE 230VAC SPRING RETURN ON/OFF.
12) TO SUPPLY AND INSTALL PU INSULATION , VAPOR BARRIER AND SHEATHED FOR ITEM NO.11
13) SUPPLY AND INSTALL 3X1.5MM PVC CABLE.
14) FIOOR PROTECTION.
15) GENERAL CLEANING AND MAKING GOOD.
2REMAPKS:    Edit Delete
 1) 50% DEPOSIT TO START WORK.
2) OPEN CEILING EXCLUDE PAINTING AND PLASTER BACK.
3) EXCLUSION: AIRCON AND WORK NOT STATED IN THIS QUOTATION.
4) OUTSTANDING BALANCE UPON COMPLETION OF WORK.
Total1.00 5,490.00
3