				| 1 | TO SUPPLY CHILLED WATER CASSETTE UNIT ONLY | 8.00 | 1,450.00 | 11,600.00 |   Edit |   Delete |  |   | 43000BTU CASSETTE
 UNIT 0701 1 NOS; UNIT 0702 2NOS; UNIT 0703 DOWNSTAIRS 5NOS |  | 2 | TO SUPPLY CHILLED WATER CASSETTE UNIT ONLY | 1.00 | 1,380.00 | 1,380.00 |   Edit |   Delete |  |   | 32000BTU CASSETTE
 UNIT07-03 UPSTAIR |  | 3 | TO SUPPLY CHILLED WATER CASSETTE UNIT ONLY | 1.00 | 1,250.00 | 1,250.00 |   Edit |   Delete |  |   | 9000BTU CASSETTE 
 UNIT 0703 UPSTAIR |  | 4 | TO SUPPLY LABOUR & MATERIALS TO INSTALL | 10.00 | 1,900.00 | 19,000.00 |   Edit |   Delete |  |   | NEW CHILLED WATER PIPING INCLUSIVE OF NECESSARY HANGER/SUPPORT;INSULATION;FITTINGS;CONTROL VALVE; PRESSURE GAUGE C/W GATE VALVE FOR EACH UNIT AND ACCESSORIES FOR 10UNIT CASSETTE UNIT |  | 5 | INCLUDING DRAWING  | 1.00 |   |   |   Edit |   Delete |  | 6 | WATER PUMP WITH INSTALLATION | 3.00 | 220.00 | 660.00 |   Edit |   Delete |  | 7 | TO PROVIDE CHEMICAL FLUSHING FOR EXISTING PIPE AND PROVIDE WATER ANALYSIS REPORT PER UNIT | 3.00 | 950.00 | 2,850.00 |   Edit |   Delete |  | 8 | REMARKS: |   |   |   |   Edit |   Delete |  |   | 1) AFTER FIRST PROGRESSIVE PAYMENT OF 70%, AIRCON ARRIVAL ABOUT 7 WORKING DAYS.
 2) MATERIALS ORDER (EX:JACKETING PIPE) TAKES ABOUT 3 TO 5 WORKING DAYS.
 3) WITH MATERIAL ARRIVE, JOB NEED 10 TO 15 WORKING DAYS TO COMPLETE.
 4) EXCLUSION: JOB NOT STATED IN THIS QUOTATION. |  | 9 | DISCOUNT -$740 | 1.00 |   |   |   Edit |   Delete |  | Total | 28.00 |   | 36,000.00 |  				
					| 