No
|
Product
|
Quantity
|
Unit Price
|
Amount
|
Function
|
1 | TO SUPPLY NEW AIRCON, LABOUR AND MATERIALS TO INSTALL: | 1.00 | 28,230.00 | 28,230.00 | Edit | Delete | | BRAND: MITSUBISHI ELECTRIC VRV
SECOND FLOOR SYSTEM A:
OUTDOOR UNIT:PUCY-EP450YSKA X 1
PKFYP32VHM WALL TYPE (MGR MEETING ROOM) X1; ADD ON PUMP
PLFY40VBM CASSETTE TYPE (PAYROLL RM/ASSIST MGR RM) X 2;
PLFYP63VBM CASSETTE TYPE (GENERAL OFFICE)X1;
PLFYP50VBM CASSETTE TYPE (CORRIDOR)X1;
PLFYP125VBM CASSETTE TYPE (DEMO RM/SOUVENIR CORNER) X 2 | 2 | SECOND FLOOR SYSTEM B | 1.00 | 29,430.00 | 29,430.00 | Edit | Delete | | OUTDOOR UNIT: PUCY-P550YSKA X 1
PLFYP125VBM CASSETTE TYPE (TRAINING RM/DEMO RM) X 2;
PLFYP40VBM CASSETTE TYPE (MGM RM) X 1;
PLFYP63VBM CASSETTE TYPE (GENERAL OFFICE/ FD COURT) X 2;
PKFYP63VBM WALL TYPE (ENTRANCE) X 1 ;ADD ON PUMP | 3 | THIRD FLOOR SYSTEM A | 1.00 | 34,730.00 | 34,730.00 | Edit | Delete | | OUTDOOR UNIT: PUCY-P550YSKA X 1
PLFYP80VBM CASSETTE TYPE (CONFERENCE RM) X 2;
PLFYP100VBM CASSETTE TYPE (GENERAL OFFICE) X 2;
PLFYP40VBM CASSETTE TYPE (MGM RM 1/MGR RM 2/DRY KITCHEN/PANTRY/MEETING RM 3) X 5 | 4 | THIRD FLOOR SYSTEM B | 1.00 | 36,880.00 | 36,880.00 | Edit | Delete | | OUTDOOR UNIT: PUCY-P600YSKA X 1
PLFYP100VBM CASSETTE TYPE (GENERAL OFFICE) X 2;
PLFYP100VBM CASSETTE TYPE (MEETING RM) X 1;
PLFYP63VBM CASSETTE TYPE (ENTRANCE) X 1;
PLFYP50VBM CASSETTE TYPE (MD RM)X 1;
PLFYP50VBM CASSETTE TYPE (ASST DIR RM) X 1;
PLFYP40VBM CASSETTE TYPE (MGM RM 4/MGM RM 6/MEETING RM 2) X 3
| 5 | 1ST STOREY | 1.00 | 3,050.00 | 3,050.00 | Edit | Delete | | SINGLE SPLIT CASSETTE
SUY-KA100/PLYP100EA | 6 | TO SUPPLY LABOUR TO DISMANTLE AHU ROOM AND DISPOSE(IF NEEDED) | 1.00 | 2,000.00 | 2,000.00 | Edit | Delete | 7 | CRANE RENTAL | 1.00 | 850.00 | 850.00 | Edit | Delete | Total | 7.00 | | 135,170.00 |
8 |
|
|
|
|
|
|
|
|