1 | TO SUPPLY LABOUR AND MATERIAL TO INSTALL VRF | | | | Edit | Delete | | C/W standard copper pipe with insulation(Armaflex Class O),concealed drain pipe ,Cable tray, wiring from blower to condenser,
testing and Commissioning. | 2 | PLOT 22 | 11.00 | 1,050.00 | 11,550.00 | Edit | Delete | | 1 set of system 7; 6xWall mounted; 1xCeiling Cassette
1 set of system 4; 4x wall mounted | 3 | PLOT 21 | 11.00 | 1,050.00 | 11,550.00 | Edit | Delete | | 1 set of system 7; 6xWall mounted; 1xCeiling Cassette
1 set of system 4; 4x wall mounted | 4 | Exclusions: | | | | Edit | Delete | | 1) PE submission
2) Noisy submission
3) Crane Booking
4) Works not stated in this quotation | 5 | Terms of payment: | | | | Edit | Delete | | 1) 30% deposit to confirm job.
2) 40% while all piping have run, and before aircon installed.
3) Full payment when T & C completed.
* No retention of 5% to HOLD when job completed. | Total | 22.00 | | 23,100.00 |