Kaili Aircond
Singapore


Online Billing Portal
Cloud Solutions Sdn Bhd
Vince : +6012 7040 900 ( watapps / wechat )
[email protected]

   File Attachement   Create Revised Copy
Customer Information
Branch Last Update SUN   
Name Quotation No Q
Running Reference : Q26/0411R1
Address Customer No
Address 2
Address 3
Address 4
Contact Tel Fax
Quotation Information
Date
    
Ref
Validity Delivery Terms
Subject
Currency Remark
      
Quotation Detail Information
No Product Quantity Unit Price Amount Function
1TO SUPPLY LABOUR AND MATERIALS TO INSTALL ONLY 64.004,750.00304,000.00 Edit Delete
 FOR MIDEA VRF 20HP 1 TO 2 CEILING DUCTED UNIT C/W 64 NOS INDDOR

***INCLUDE INSULATION MAIN PIPE,COPPER PIPE CONNECTIONS LIQUID PIPE( 22.2 MM)(GAS PIPE 31.80MM) WATER PIPE, CABLE & CABLE TARY,SUPPORT BRACKET,STUD ROD AND ALL NECESSARY PARTS.

2TO SUPPLY AND INSTALL56.001,100.0061,600.00 Edit Delete
 DUCTED UNIT FILTER INCLUDED 45 DEGREE GRILL AND DOUBLE D GRILL FOR CEILING DUCTED FCU.


3TO SUPPLY AND INSTALL64.00480.0030,720.00 Edit Delete
 CUSTOMIZED WATER TRAY FOR NEW INDOOR DUCTED UNIT.

4TO SUPPLY AND INSTALL G1 WATR TRAY6MX1.8M C/W PIPE FOR OUTDOOR VRF 5.002,454.0012,270.00 Edit Delete
5TO SUPPLY AND INSTALL WATER PUMP FOR OUTDOOR VRF 5.00380.001,900.00 Edit Delete
6TO SUPPLY AND INSTALL ELBOW DUCT FOR CEILING DUCTED OUTDOOR UNIT 21.00950.0019,950.00 Edit Delete
7TO SUPPLY AND INSTALL 21 NOS OUTDOOR SUPPORT BRACKET INCLUDED 4 INCH STUD LOG AND C BRACKET 21.00900.0018,900.00 Edit Delete
 
8TO SUPPLY AND INSTALL 1 LOTS OF FABRICATE FRESH DUCT CONNECT TO 8 NOS INDOOR VRF DUCT UNIT 8.003,120.0024,960.00 Edit Delete
  INCLUDED PU FOAM DUCT SINGLE D 4 WAY GRILL AND ALL NECESSARY C/W FLEXIBLE DUCT (LENGTH FOR DUCT IS 7M TO 10M)

9SCISSOR LIFT BOOKING1.008,000.008,000.00 Edit Delete
 1)*SCISSOR LIFT BOOKING 2 UNIT X1MONTH
2) *SCISSOR LIFT BOOKING 4 UNIT X2MONTH
10CRANE LIFT 2TIMES1.001,800.001,800.00 Edit Delete
11PE ENDORSEMENT & DRAWING1.005,900.005,900.00 Edit Delete
12   
  
13TERM OF PAYMENT :     Edit Delete
 1 ) 10% DEPOSIT PAYMENT
2) 30% PAYMENT UPON GOODS ARRIVE AND BEFORE DELIVERY
3) 30% PAYMENT PROGRESSIVE CLAIM UPON DELIVERYOF AIRCON
4) 20% PAYMENT CLAIM UPONCOMPLETION OF INSTALLATION
5) 10% BALANCE FULL PAYMENT UPON COMPLETION OF T&C
Total247.00 490,000.00