Kaili Aircond
Singapore


Online Billing Portal
Cloud Solutions Sdn Bhd
Vince : +6012 7040 900 ( watapps / wechat )
[email protected]

   File Attachement   Create Revised Copy
Customer Information
Branch Last Update SUN   
Name Quotation No Q
Running Reference : Q25/0941R1
Address Customer No
Address 2
Address 3
Address 4
Contact Tel Fax
Quotation Information
Date
    
Ref
Validity Delivery Terms
Subject
Currency Remark
      
Quotation Detail Information
No Product Quantity Unit Price Amount Function
1   
  
2TO SUPPLY LABOUR AND MATERIAL TO INSTALL 1 SET1.0014,190.0014,190.00 Edit Delete
 1 TO 2 CEILING DUCTED UNIT
RXMUQ6AVEG 1PH
FXMQ63PAVE(W) *(Wireless C/Ducted) x1 (FOR BEDROOM 1) 18000BTU
FXMQ100PAVE(W * (Wireless C/Ducted) x1 (FOR MASTER BEDROOM) 38000BTU


3TO SUPPLY LABOUR AND MATERIAL TO INSTALL 1 SET1.0014,890.0014,890.00 Edit Delete
 DAIKIN INVERTER CEILING DUCTED 1TO2
RXMUQ6AVEG 1PH
FXMQ80PAVE(W)*1 Wireless C/Ducted) x1 (FOR DINING) 30000BTU
FXMQ100PAVE(W *1 (Wireless C/Ducted) x1 (FOR BEDROOM 2 &3) 38000btu


4 TO SUPPLY LABOUR AND MATERIAL TO INSTALL 1.004,955.004,955.00 Edit Delete
 DAIKIN INVERTER WALL MOUNTED 1TO2
MKM75ZVMG
FTKM25ZVMG *1 (FOR HELPER ROOM) 9000 BTU
CTKM50ZVMG *1 (FOR WET KITCHEN) 18000 BTU

*INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID);
TO FCU 3/4" THK;
WATER PIPE 16MM-25MM; CABLE AND ALL NECESSARY PARTS.
TESTING & COMMISSIONING APPLIED.
*WARRANTY FOR NEW AIRCON
*1 YEAR SPARE PARTS
*5 YEARS COMPRESSOR

**CRANE BOOKING (IF ANY) $1900 / 1 DAY
5 TO SUPPLY LABOUR AND MATERIAL TO INSTALL WATER TRAY5.00280.001,400.00 Edit Delete
  FOR DINING , MASTER BEDROOM AND BEDROOM 1 ,2 &3 )LIVING

6 NEW DUCTING WORK FOR LIVING1.007,150.007,150.00 Edit Delete
 TO SUPPLY LABOUR AND FABRICATE MAIN DUCT RETURN AND MATERIAL USED;
PU FOAM.C/W LINER BOX INCLUDE FILTER.

7 NEW DUCTING WORK FOR DINING AND MASTER BEDROOM2.004,700.009,400.00 Edit Delete
 TO SUPPLY LABOUR AND FABRICATE MAIN DUCT RETURN AND MATERIAL USED;
PU FOAM.C/W LINER BOX .INCLUTE FILTER
8 NEW DUCTING WORK FOR BEDROOM 1, 2&233.004,235.0012,705.00 Edit Delete
 TO SUPPLY LABOUR AND FABRICATE MAIN DUCT RETURN AND MATERIAL USED;
PU FOAM.C/W LINER BOX INCLUTE FILTER
9 TO SUPPLY LABOUR TO DISMANT AIR CONDITIONER1.002,200.002,200.00 Edit Delete
10REMARKS:    Edit Delete
 1) 50% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 30% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 20%FULL PAYMENT UPON JOB COMPLETED.
4) EXCLUSION: WORKS NOT STATED ABOVE.


**NO NEED OUTDOOR BRACKET

11 DISCOUNT -5% (3635)1.00   Edit Delete
Total16.00 63,255.00