| 1 | TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL: | 2.00 | 13,500.00 | 27,000.00 | Edit | Delete | | | MITSUBISHI HEAVY DUTY VRF SYSTEMS
1TO2 CASSETTE 14.0KW X2 (2SET)
FDC280CKXZA2-S8
FDT140KXZE1/1 *2
(CU1 -1 )-FCU1-1/1,FCU1-1/2
( CU1-2 )-FCU-1-2/1,FCU1-2/2
| | 2 | TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL: | 4.00 | 13,500.00 | 54,000.00 | Edit | Delete | | | MITSUBISHI HEAVY DUTY VRF SYSTEMS
1TO2 CASSETTE 14.0KW *2 (4SET )
FDC280CKXZA2-S8
FDT140KXZE1/1 *2
CU2 -1 )-FCU2-1/1, FCU2-1/2
( CU2-2 )-FCU2-2/1,FCU2-2/2
(CU3-1 )-FCU3-1/1,FCU3-1/2
( CU3-2)-FCU3-2/1,FCU3-2/2
|
|
3 |
|
|
|
|
|
|
|
|
|
| 4 | TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL: | 1.00 | 13,200.00 | 13,200.00 | Edit | Delete | | | MITSUBISHI HEAVY DUTY VRF SYSTEMS
1TO3 CASSETTE
FDC140KXES6/A
FDT45KXZE1/1 *1 CASSETTE FOR FCU L 1/1
FDT36KXZE1/1*2 -CASSETTE FOR FCU L-1/2,FCU L-1/3
| | 5 | TO SUPPLY AND INSTALL MAIN PIPE FOR 1ST | 2.00 | 1,800.00 | 3,600.00 | Edit | Delete | | | OUTDOOR CONDENSING INSTALL AT LEVEL3
| | 6 | TO SUPPLY AND INSTALL MAIN PIPE FOR 2ND AND 3RD STOREY | 4.00 | 1,800.00 | 7,200.00 | Edit | Delete | | | OUTDOOR CONDENSING INSTALL AT LEVEL3.
| | 7 | TO SUPPLY AND INSTALL MAIN PIPE FOR 4TH AND 5TH | 2.00 | 1,800.00 | 3,600.00 | Edit | Delete | | | OUTDOOR CONDENSING INSTALL AT ROOFTOP.
| | 8 | TO SUPPLY AND INSTALL MAIN PIPE | 1.00 | 1,800.00 | 1,800.00 | Edit | Delete | | | OUTDOOR CONDENSING INSTALL 1ST TO 3RD STOREY LOBBY .
| | 9 | CRANE BOOKING $1800/1DAY | 1.00 | 1,800.00 | 1,800.00 | Edit | Delete | | 10 | REMARKS | | | | Edit | Delete | | | INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
WATER PIPE 16MM-25MM; CABLE TRAY AND ALL NECESSARY PARTS.
**INCLUDE CONCEAL
TESTING $ COMMISSIONING APPLIED.
*WARRANTY FOR NEW AIRCON
*1 YEAR SPARE PARTS
*5 YEARS COMPRESSOR
**EXCLUDE AIRCON BRACKET FOR VRV
**EXCLUDE SUBMISSION AND **CRANE BOOKING .
1) 50% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 30% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 20%FULL PAYMENT UPON JOB COMPLETED.
4) EXCLUSION: WORKS NOT STATED ABOVE. | | Total | 17.00 | | 112,200.00 |
|