Quotation Detail Information
No Product Quantity Unit Price Amount Function
1TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL:2.0014,850.0029,700.00 Edit Delete
 DAIKIN -VRV IV (INVERTER R410A GAS )
CU-RXQ10BYMG
FCU-FXFQ125AVM(W) *2 CASSETTE
(CU1 -1 AND CU1-2 )


2 TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL:4.0014,850.0059,400.00 Edit Delete
 DAIKIN -VRV IV (INVERTER R410A GAS )
CU- RXQ10BYMG *1
FCU-FXFQ125AVM(W) *2 CASSETTE
(CU2 -1 AND CU2-2 )
(CU3-1 AND CU3-2)

3TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL:2.0014,150.0028,300.00 Edit Delete
 DAIKIN -VRV IV (INVERTER R410A GAS )
CU-RXQ8BYMG *1
FCU-FXFQ100AVM(W) *2 CASSETTE
(CU4-1 ANA CU4-2)
(CU5-1 AND CU5-2)

4TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL:1.0014,600.0014,600.00 Edit Delete
 DAIKIN -VRV IV (INVERTER R410A GAS )
CU-RSMUQ4AVEG 1PH *1
FCU-FXAQ40BVM(W) *1 WALL FOR FCU L 1/1
FCU-FXAQ32BVM(W) *1 WALL FOR FCU L-1/2
FCU-FXAQ32BVM(W) *1 WALL FOR FCU L-1/3

5TO SUPPLY AND INSTALL MAIN PIPE FOR 1ST 2.001,800.003,600.00 Edit Delete
 OUTDOOR CONDENSING INSTALL AT LEVEL3

6   
  
7TO SUPPLY AND INSTALL MAIN PIPE FOR 4TH AND 5TH 2.001,800.003,600.00 Edit Delete
 OUTDOOR CONDENSING INSTALL AT ROOFTOP.

8 TO SUPPLY AND INSTALL MAIN PIPE 1.001,800.001,800.00 Edit Delete
 OUTDOOR CONDENSING INSTALL 1ST TO 3RD STOREY LOBBY .

9*CRANE BOOKING $1800/1DAY1.001,800.001,800.00 Edit Delete
10REMARKS    Edit Delete
  INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
WATER PIPE 16MM-25MM; CABLE TRAY AND ALL NECESSARY PARTS.
**INCLUDE CONCEAL
TESTING $ COMMISSIONING APPLIED.

*WARRANTY FOR NEW AIRCON
*1 YEAR SPARE PARTS
*5 YEARS COMPRESSOR

**EXCLUDE AIRCON BRACKET FOR VRV
**EXCLUDE SUBMISSION AND **CRANE BOOKING .

1) 50% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 30% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 20%FULL PAYMENT UPON JOB COMPLETED.
4) EXCLUSION: WORKS NOT STATED ABOVE.
Total15.00 142,800.00