No
|
Product
|
Quantity
|
Unit Price
|
Amount
|
Function
|
| 1 | TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL: | 2.00 | 14,850.00 | 29,700.00 | Edit | Delete | | | DAIKIN -VRV IV (INVERTER R410A GAS )
CU-RXQ10BYMG
FCU-FXFQ125AVM(W) *2 CASSETTE
(CU1 -1 AND CU1-2 )
| | 2 | TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL: | 4.00 | 14,850.00 | 59,400.00 | Edit | Delete | | | DAIKIN -VRV IV (INVERTER R410A GAS )
CU- RXQ10BYMG *1
FCU-FXFQ125AVM(W) *2 CASSETTE
(CU2 -1 AND CU2-2 )
(CU3-1 AND CU3-2)
| | 3 | TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL: | 2.00 | 14,150.00 | 28,300.00 | Edit | Delete | | | DAIKIN -VRV IV (INVERTER R410A GAS )
CU-RXQ8BYMG *1
FCU-FXFQ100AVM(W) *2 CASSETTE
(CU4-1 ANA CU4-2)
(CU5-1 AND CU5-2)
| | 4 | TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL: | 1.00 | 14,600.00 | 14,600.00 | Edit | Delete | | | DAIKIN -VRV IV (INVERTER R410A GAS )
CU-RSMUQ4AVEG 1PH *1
FCU-FXAQ40BVM(W) *1 WALL FOR FCU L 1/1
FCU-FXAQ32BVM(W) *1 WALL FOR FCU L-1/2
FCU-FXAQ32BVM(W) *1 WALL FOR FCU L-1/3
| | 5 | TO SUPPLY AND INSTALL MAIN PIPE FOR 1ST | 2.00 | 1,800.00 | 3,600.00 | Edit | Delete | | | OUTDOOR CONDENSING INSTALL AT LEVEL3
|
|
6 |
|
|
|
|
|
|
|
|
|
| 7 | TO SUPPLY AND INSTALL MAIN PIPE FOR 4TH AND 5TH | 2.00 | 1,800.00 | 3,600.00 | Edit | Delete | | | OUTDOOR CONDENSING INSTALL AT ROOFTOP.
| | 8 | TO SUPPLY AND INSTALL MAIN PIPE | 1.00 | 1,800.00 | 1,800.00 | Edit | Delete | | | OUTDOOR CONDENSING INSTALL 1ST TO 3RD STOREY LOBBY .
| | 9 | *CRANE BOOKING $1800/1DAY | 1.00 | 1,800.00 | 1,800.00 | Edit | Delete | | 10 | REMARKS | | | | Edit | Delete | | | INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
WATER PIPE 16MM-25MM; CABLE TRAY AND ALL NECESSARY PARTS.
**INCLUDE CONCEAL
TESTING $ COMMISSIONING APPLIED.
*WARRANTY FOR NEW AIRCON
*1 YEAR SPARE PARTS
*5 YEARS COMPRESSOR
**EXCLUDE AIRCON BRACKET FOR VRV
**EXCLUDE SUBMISSION AND **CRANE BOOKING .
1) 50% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 30% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 20%FULL PAYMENT UPON JOB COMPLETED.
4) EXCLUSION: WORKS NOT STATED ABOVE. | | Total | 15.00 | | 142,800.00 |
|