Kaili Aircond
Singapore


Online Billing Portal
Cloud Solutions Sdn Bhd
Vince : +6012 7040 900 ( watapps / wechat )
[email protected]

   File Attachement   Create Revised Copy
Customer Information
Branch Last Update SUN   
Name Quotation No Q
Running Reference : Q25/1226
Address Customer No
Address 2
Address 3
Address 4
Contact Tel Fax
Quotation Information
Date
    
Ref
Validity Delivery Terms
Subject
Currency Remark
      
Quotation Detail Information
No Product Quantity Unit Price Amount Function
1TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL:2.0012,700.0025,400.00 Edit Delete
 DAIKIN -VRV IV (INVERTER R410A GAS )
CU-RSUQ7AYMG 3PH *1
FCU-FXFQ80AVM(W) *2 CASSETTE
(CU1 -1 AND CU1-2 )


2 TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL:4.0013,400.0053,600.00 Edit Delete
 DAIKIN -VRV IV (INVERTER R410A GAS )
CU-RSUQ9AYMG 3PH *1
FCU-FXFQ125AVM(W) *2 CASSETTE
(CU2 -1 AND CU2-2 )
(CU3-1 AND CU3-2)

3TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL:2.0013,100.0026,200.00 Edit Delete
 DAIKIN -VRV IV (INVERTER R410A GAS )
CU-RSUQ8AYMG 3PH *1
FCU-FXFQ100AVM(W) *2 CASSETTE
(CU4-1 ANA CU4-2)

4TO SUPPLY AIRCON,LABOUR AND MATERIALS TO INSTALL:1.0014,600.0014,600.00 Edit Delete
 DAIKIN -VRV IV (INVERTER R410A GAS )
CU-RSUQ4AYMG 1PH *1
FCU-FXFQ40AVM(W) *1 CASSETTE
FCU-FXFQ25AVM(W) *1 CASSETTE
FCU-FXFQ25AVM(W) *1 CASSETTE

5TO SUPPLY AND INSTALL MAIN PIPE FOR 1ST 2.002,800.005,600.00 Edit Delete
 OUTDOOR CONDENSING INSTALL AT ROOFTOP.

6   
  
7TO SUPPLY AND INSTALL MAIN PIPE FOR 4TH AND 5TH 2.002,000.004,000.00 Edit Delete
 OUTDOOR CONDENSING INSTALL AT ROOFTOP.

8 TO SUPPLY AND INSTALL MAIN PIPE 1.002,000.002,000.00 Edit Delete
 OUTDOOR CONDENSING INSTALL 1ST TO 3RD STOREY LOBBY .

9 REMARKS    Edit Delete
 INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
WATER PIPE 16MM-25MM; CABLE TRAY AND ALL NECESSARY PARTS.
**INCLUDE CONCEAL
TESTING $ COMMISSIONING APPLIED.

*WARRANTY FOR NEW AIRCON
*1 YEAR SPARE PARTS
*5 YEARS COMPRESSOR

**EXCLUDE AIRCON BRACKET FOR VRV
**EXCLUDE SUBMISSION AND **CRANE BOOKING .

1) 50% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 30% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 20%FULL PAYMENT UPON JOB COMPLETED.
4) EXCLUSION: WORKS NOT STATED ABOVE.
Total14.00 131,400.00