Kaili Aircond
Singapore


Online Billing Portal
Cloud Solutions Sdn Bhd
Vince : +6012 7040 900 ( watapps / wechat )
[email protected]

   File Attachement   Create Revised Copy
Customer Information
Branch Last Update SUN   
Name Quotation No Q
Running Reference : Q25/1130
Address Customer No
Address 2
Address 3
Address 4
Contact Tel Fax
Quotation Information
Date
    
Ref
Validity Delivery Terms
Subject
Currency Remark
      
Quotation Detail Information
No Product Quantity Unit Price Amount Function
1TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL1.0011,700.0011,700.00 Edit Delete
 DAIKIN INVERTER CEILING DUCTED 1TO2

DAIKIN VRV IV-S (5 TICK)
RXMUQ6AVEG 1PH
FXMQ50PAVE (WIRELESS C/DUCTED) X 1 FOR MASTER ROONM & WARDROBE
FXMQ80PAVE (WIRELESS C/DUCTED) X 1 FOR LIVING AREA
2   
  
3TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL1.003,480.003,480.00 Edit Delete
 DAIKIN INVERTER 1TO1 CEILING DUCTED
DAIKIN RZF50DVMG + FBFC50EVMG (Wireless)4️⃣✅ (1 Phase)
17060 BTU
FOR DRY KITCHEN

4TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL1.004,850.004,850.00 Edit Delete
 DAIKIN INVERTER 1TO3 WALL ismile Eco Multi Split R32 gas5️⃣✅
MKM75ZVMG /
CTKM25ZVMG*3
FOR BEDROOM1-3


**INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
WATER PIPE 16MM-25MM; CABLE AND ALL NECESSARY PARTS.
**INCLUDE FILTER AND WATER TARY .
TESTING $ COMMISSIONING APPLIED.

K-FLEX CLASS O
~21SWG COPPER PIPE



*WARRANTY FOR NEW AIRCON
*1 YEAR SPARE PARTS
*5 YEARS COMPRESSOR

**CRANE BOOKING (IF ANY) $1900/1DEY
**USE BACK EXISTING FLOOR STANDING BRACKET .

5DUCT WORK FOR MASTER AND DINING & LIVING 3.004,800.0014,400.00 Edit Delete
 TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS.

6 DUCT WORK FOR DRY KITCHEN 1.003,800.003,800.00 Edit Delete
  TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS.

*INCLUDE PLENUM BOX C/W INTERNAL AMAFLEX SHEET INSULATION ,
AND ALL NECESSARY PARTS.
7 TO SUPPLY LABOUR TO DISMANTLE EXISTING AND DISPOSE .1.00600.00600.00 Edit Delete
8REMARKS    Edit Delete
 1) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 10%FULL PAYMENT UPON JOB COMPLETED.
4) EXCLUSION: WORKS NOT STATED ABOVE.
Total8.00 38,830.00