Kaili Aircond
Singapore


Online Billing Portal
Cloud Solutions Sdn Bhd
Vince : +6012 7040 900 ( watapps / wechat )
[email protected]

   File Attachement   Create Revised Copy
Customer Information
Branch Last Update SUN   
Name Quotation No Q
Running Reference : Q25/1130
Address Customer No
Address 2
Address 3
Address 4
Contact Tel Fax
Quotation Information
Date
    
Ref
Validity Delivery Terms
Subject
Currency Remark
      
Quotation Detail Information
No Product Quantity Unit Price Amount Function
1   
  
2TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL1.004,690.004,690.00 Edit Delete
 DAIKIN INVERTER 1TO 1 CEILING DUCTED
RZF100DVMG (1 Phase) + FBFC100DVMG (Wireless) 4️⃣✅
32400BTU
FOR DINING

3TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL1.003,480.003,480.00 Edit Delete
 DAIKIN INVERTER 1TO1 CEILING DUCTED
DAIKIN RZF50DVMG + FBFC50EVMG (Wireless)4️⃣✅ (1 Phase)
17060 BTU
FOR DRY KITCHEN

4TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL1.004,850.004,850.00 Edit Delete
 DAIKIN INVERTER 1TO3 WALL ismile Eco Multi Split R32 gas5️⃣✅
MKM75ZVMG /
CTKM25ZVMG*3
FOR BEDROOM1-3


**INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
WATER PIPE 16MM-25MM; CABLE AND ALL NECESSARY PARTS.
**INCLUDE FILTER AND WATER TARY .
TESTING $ COMMISSIONING APPLIED.

K-FLEX CLASS O
~21SWG COPPER PIPE



*WARRANTY FOR NEW AIRCON
*1 YEAR SPARE PARTS
*5 YEARS COMPRESSOR

**CRANE BOOKING (IF ANY) $1900/1DEY
**USE BACK EXISTING FLOOR STANDING BRACKET .

5DUCT WORK FOR MASTER AND DINING & LIVING 3.004,800.0014,400.00 Edit Delete
 TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS.

6 DUCT WORK FOR DRY KITCHEN 1.003,800.003,800.00 Edit Delete
  TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS.

*INCLUDE PLENUM BOX C/W INTERNAL AMAFLEX SHEET INSULATION ,
AND ALL NECESSARY PARTS.
7 TO SUPPLY LABOUR TO DISMANTLE EXISTING AND DISPOSE .1.00600.00600.00 Edit Delete
8REMARKS    Edit Delete
 1) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 10%FULL PAYMENT UPON JOB COMPLETED.
4) EXCLUSION: WORKS NOT STATED ABOVE.
Total8.00 31,820.00