|
No
|
Product
|
Quantity
|
Unit Price
|
Amount
|
Function
|
| 1 | FOR LIVING | 1.00 | 3,550.00 | 3,550.00 | Edit | Delete | | | TO SUPPLY LABOUR AND MATERIALS TO INSTALL 1TO1
MITSUBISHI ELECTRIC CEILING DUCTED (R32 GAS)
SUY-M80VA-SG.TH + PEY-M80JAL2-SG.TH (WIRELESS)
27296BTU
| | 2 | DUCT WORKS LIVING AREA | 1.00 | 3,400.00 | 3,400.00 | Edit | Delete | | | TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED;
PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS.
|
|
3 |
|
|
|
|
|
|
|
|
|
| 4 | FOR MASTER BEDROOM & BEDROOM 2 | 1.00 | 5,950.00 | 5,950.00 | Edit | Delete | | | TO SUPPLY LABOUR AND MATERIALS TO INSTALL 1TO2
MITSUBISHI ELECTRIC CEILING DUCTED (R32 GAS)
MXY-4H33VG-SG
SEZ-M35DAL-SG.TH (12,000BTU)
SEZ-M50DAL-SG.TH (18,000BTU)
| | 5 | DUCT WORKS FOR BEDROOM 2 , BEDROOM 3 KITCHEN & PRIVATE LIFT LOBBY | 3.00 | 2,200.00 | 6,600.00 | Edit | Delete | | | TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED;
PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS.
| | 6 | DUCT WORKS FOR MASTER BEDROOM | 1.00 | 2,900.00 | 2,900.00 | Edit | Delete | | | TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED;
PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS.
*INCLUDE INSULATION PIPE AND COPPER PIPE .
WATER PIPE 16MM-25MM; CABLE AND ALL NECESSARY PARTS.
**INCLUDE CONCEAL
TESTING $ COMMISSIONING APPLIED.
*WARRANTY FOR NEW AIRCON
*1 YEAR SPARE PARTS
*5 YEARS COMPRESSOR
**CRANE BOOKING (IF ANY) $1900 / DAY
| | 7 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL WATER TRAY FOR DUCTED | 5.00 | 320.00 | 1,600.00 | Edit | Delete | | 8 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL OUTDOOR BRACKET | 3.00 | 180.00 | 540.00 | Edit | Delete | | 9 | REMARKS | | | | Edit | Delete | | | 1) AIRCON C/W WIRELESS REMOTE CONTROLLER
2) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
3) FULL PAYMENT UPON JOB COMPLETED.
4) EXCLUSION: WORKS NOT STATED ABOVE.
| | Total | 15.00 | | 24,540.00 |
|