						No
					 | 
					
						Product
					 | 
					
						Quantity
					 | 
					
						Unit Price
					 | 
					
						Amount
					 | 
					
						Function
					 | 
				
											
								| 
									1								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							
							
							
								| 
								 | 
								
																	 | 
							
							
								| 
																		  
																	 | 
							
	
				| 2 | TO SUPPLY  LABOUR AND MATERIALS TO INSTALL: | 1.00 | 3,850.00 | 3,850.00 |   Edit |   Delete | 
|   | CHILL WATER DUCTED FAN COIL UNIT INCLUSIVE SWANGER; MOTORISED VALVE; GATE VALVE AND BALANCING VALVE.
 
  | 
| 3 | DUCT WORK  | 1.00 | 2,900.00 | 2,900.00 |   Edit |   Delete | 
|   | TO SUPPLY LABOUR AND MATERIALS TO INSTALL I LOT INSULATED AIRCON DUCTING MATERAIL IN USED PU FOAM C/W  NECECESSARY FLEXIBLE DUCTED.
 
  | 
| 4 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL | 10.00 | 360.00 | 3,600.00 |   Edit |   Delete | 
|   | 10 NOS 4 WAY GRILLE 450 x 300 C/W  VCD .
 
  | 
| 5 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL | 1.00 | 1,200.00 | 1,200.00 |   Edit |   Delete | 
|   |  3 NOS RETURN EGG CRATE  GRILLE AND INTERNAL RETURN BOX .
 
  | 
| 6 | 	TO SUPPLY AND INSTALL CUSTOMIZED WATER TRAY | 1.00 | 380.00 | 380.00 |   Edit |   Delete | 
|   | 
  | 
| 7 | TO SUPPLY AND INSTALL CUSTOMIZED FILTER. | 1.00 | 280.00 | 280.00 |   Edit |   Delete | 
|   | 
 
  | 
| 8 | SUPPLY AND INSTALL CONTROL PANEL. | 1.00 | 2,900.00 | 2,900.00 |   Edit |   Delete | 
|   | 
 
  | 
| 9 | WATER FLUSHING AND WATER ANALYSIS REPORT  | 1.00 | 3,000.00 | 3,000.00 |   Edit |   Delete | 
|   | 
  | 
| 10 | TO PROVIDE SUBMISSION PLAN  | 1.00 | 3,200.00 | 3,200.00 |   Edit |   Delete | 
|   | FOR THE PROPOSED AIRCON CHILLER FOR JTC BUILDING MANAGEMENT APPROVAL.
 THE BUILDING HAVE ANY GREEN MARK REQUIREMENTS.
 THE BUILDING HAVE ANY ECO FRIENDLY REQUIREMENTS THE BUILDING HAVE ANY CONNECTIONS WITH NEA REQUIREMENTS.
 
 
 
  | 
| 11 | REMARKS |   |   |   |   Edit |   Delete | 
|   | 	1) 70% DEPOSIT TO CONFIRM JOB AND ORDER AIRCON.
 2) 2ND PROGRESSIVE PAYMENT OF 20% COLLECTION.
 3) BALANCE UPON JOB COMPLETION.
 4) EXCLUSION: JOBS NOT STATED IN THIS QUOTATION. | 
| Total | 18.00 |   | 21,310.00 |