Quotation Information
Date
    
Ref
Validity Delivery Terms
Subject
Currency Remark
      
Quotation Detail Information
No Product Quantity Unit Price Amount Function
1TO SUPPLY LABOUR AND MATERIAL TO INSTALL 1 SET OF NEW MITSUBISHI ELECTRIC CEILING DUCTED UNIT1.005,610.005,610.00 Edit Delete
 MODEL : PUY-M125VDA-SG.TH + PEY-M125JAL2-SG.TH [R32] 48000BTU
FOR LIVING ROOM


2TO SUPPLY LABOUR AND MATERIAL TO INSTALL 1 SET OF NEW MITSUBISHI ELECTRIC1.0012,980.0012,980.00 Edit Delete
 1 TO 2 CEILING DUCTED UNIT
MODEL : PUMY-CP175YKM2-PA (3PH)
PEFY-P63VMA-E (Wireless C/Ducted) x1 (FOR BEDROOM 1) 18000BTU
PEFY-P80VMA-E (Wireless C/Ducted) x1 (FOR MASTER BEDROOM) 30000BTU


3TO SUPPLY LABOUR AND MATERIAL TO INSTALL 1 SET OF NEW MITSUBISHI ELECTRIC 1.0016,380.0016,380.00 Edit Delete
 1 TO 3 CEILING DUCTED UNIT
MODEL : PUMY-CP200YKM2-PA (3PH)
PEFY-P63VMA-E (Wireless C/Ducted) x2 (FOR BEDROOM 2 &3) 18000BTU
PEFY-P80VMA-E (Wireless C/Ducted) x1 (FOR DINING) 30000BTU


4TO SUPPLY LABOUR AND MATERIAL TO INSTALL 1 SET OF NEW MITSUBISHI ELECTRIC1.004,455.004,455.00 Edit Delete
 1 TO 2 WALL MOUNTED
MODEL : MXY-3H28VG
MSXY-FP10VG*1 (FOR HELPER ROOM) 9000 BTU
MSXY-FP18VG*1 (FOR WET KITCHEN) 18000 BTU




*INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID);
TO FCU 3/4" THK;
WATER PIPE 16MM-25MM; CABLE AND ALL NECESSARY PARTS.
TESTING & COMMISSIONING APPLIED.
*WARRANTY FOR NEW AIRCON
*1 YEAR SPARE PARTS
*5 YEARS COMPRESSOR

**CRANE BOOKING (IF ANY) $1900 / 1 DAY
5TO SUPPLY LABOUR AND MATERIAL TO INSTALL WATER TRAY FOR LIVING ROOM1.00420.00420.00 Edit Delete
6TO SUPPLY LABOUR AND MATERIAL TO INSTALL WATER TRAY 5.00280.001,400.00 Edit Delete
 FOR DINING , MASTER BEDROOM AND BEDROOM 1 ,2 &3 )



7NEW DUCTING WORK FOR LIVING 1.007,150.007,150.00 Edit Delete
 TO SUPPLY LABOUR AND FABRICATE MAIN DUCT RETURN AND MATERIAL USED;
PU FOAM.C/W LINER BOX INCLUDE FILTER



8NEW DUCTING WORK FOR DINING AND MASTER BEDROOM 2.004,700.009,400.00 Edit Delete
 TO SUPPLY LABOUR AND FABRICATE MAIN DUCT RETURN AND MATERIAL USED;
PU FOAM.C/W LINER BOX .INCLUTE FILTER



9   
  
10TO SUPPLY LABOUR TO DISMANT AIR CONDITIONER1.002,200.002,200.00 Edit Delete
11REMARKS:    Edit Delete
 1) 50% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 30% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 20%FULL PAYMENT UPON JOB COMPLETED.
4) EXCLUSION: WORKS NOT STATED ABOVE.


**NO NEED OUTDOOR BRACKET

Total14.00 59,995.00