No
|
Product
|
Quantity
|
Unit Price
|
Amount
|
Function
|
1 | TO SUPPLY LABOUR AND MATERIAL TO INSTALL 1 SET OF NEW MITSUBISHI ELECTRIC CEILING DUCTED UNIT | 1.00 | 5,610.00 | 5,610.00 | Edit | Delete |
| MODEL : PUY-M125VDA-SG.TH + PEY-M125JAL2-SG.TH [R32] 48000BTU
FOR LIVING ROOM
|
2 | TO SUPPLY LABOUR AND MATERIAL TO INSTALL 1 SET OF NEW MITSUBISHI ELECTRIC | 1.00 | 12,980.00 | 12,980.00 | Edit | Delete |
| 1 TO 2 CEILING DUCTED UNIT
MODEL : PUMY-CP175YKM2-PA (3PH)
PEFY-P63VMA-E (Wireless C/Ducted) x1 (FOR BEDROOM 1) 18000BTU
PEFY-P80VMA-E (Wireless C/Ducted) x1 (FOR MASTER BEDROOM) 30000BTU
|
3 | TO SUPPLY LABOUR AND MATERIAL TO INSTALL 1 SET OF NEW MITSUBISHI ELECTRIC | 1.00 | 16,380.00 | 16,380.00 | Edit | Delete |
| 1 TO 3 CEILING DUCTED UNIT
MODEL : PUMY-CP200YKM2-PA (3PH)
PEFY-P63VMA-E (Wireless C/Ducted) x2 (FOR BEDROOM 2 &3) 18000BTU
PEFY-P80VMA-E (Wireless C/Ducted) x1 (FOR DINING) 30000BTU
|
4 |
|
|
|
|
|
|
|
5 | TO SUPPLY LABOUR AND MATERIAL TO INSTALL WATER TRAY FOR LIVING ROOM | 1.00 | 420.00 | 420.00 | Edit | Delete |
6 | TO SUPPLY LABOUR AND MATERIAL TO INSTALL WATER TRAY | 5.00 | 280.00 | 1,400.00 | Edit | Delete |
| FOR DINING , MASTER BEDROOM AND BEDROOM 1 ,2 &3 )
|
7 | NEW DUCTING WORK FOR LIVING | 1.00 | 7,150.00 | 7,150.00 | Edit | Delete |
| TO SUPPLY LABOUR AND FABRICATE MAIN DUCT RETURN AND MATERIAL USED;
PU FOAM.C/W LINER BOX INCLUDE FILTER
|
8 | NEW DUCTING WORK FOR DINING AND MASTER BEDROOM | 2.00 | 4,700.00 | 9,400.00 | Edit | Delete |
| TO SUPPLY LABOUR AND FABRICATE MAIN DUCT RETURN AND MATERIAL USED;
PU FOAM.C/W LINER BOX .INCLUTE FILTER
|
9 | NEW DUCTING WORK FOR BEDROOM 1, 2,3 | 3.00 | 4,235.00 | 12,705.00 | Edit | Delete |
| TO SUPPLY LABOUR AND FABRICATE MAIN DUCT RETURN AND MATERIAL USED;
PU FOAM.C/W LINER BOX INCLUTE FILTER
|
10 | TO SUPPLY LABOUR TO DISMANT AIR CONDITIONER | 1.00 | 2,200.00 | 2,200.00 | Edit | Delete |
11 | REMARKS: | | | | Edit | Delete |
| 1) 50% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 30% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 20%FULL PAYMENT UPON JOB COMPLETED.
4) EXCLUSION: WORKS NOT STATED ABOVE.
**NO NEED OUTDOOR BRACKET
|
Total | 16.00 | | 68,245.00 |