				| 1 | TO SUPPLY LABOUR AND MATERIALS TO NEW INSTALL  | 16.00 | 28,500.00 | 456,000.00 |   Edit |   Delete |  |   | MIDEA VRF MIDEA -20HP 1TO1 CEINING DUCTED UNIT 
 MODEL:MVC-M560WV2GN1(G)
 MIH560T1HN18
 
 *INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
 WATER PIPE 16MM-25MM;  AND ALL NECESSARY PARTS
 TESTING $ COMMISSIONING APPLIED.
 
 *WARRANTY FOR NEW AIRCON
 *1 YEAR SPARE PARTS
 *5 YEARS COMPRESSOR
 
 **EXCLUDE AIRCON BRACKET FOR VRF
 **EXCLUDE SUBMISSION
 
  |  							
								| 
									2								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							 							
							
								| 
								 | 
								
																	 | 
							 
							
								| 
																		  
																	 | 
							 	
				| 3 | TO SUPPLY AND INSTALL WATER TARY FOR OUTOOR  | 16.00 | 1,500.00 | 24,000.00 |   Edit |   Delete |  | 4 | DUCTING WORK  | 16.00 | 950.00 | 15,200.00 |   Edit |   Delete |  |   | 	TO SUPPLY LABOUR AND MATERIALS TO CONNECT DUCT WORK AND FILTER .
 
  |  | 5 | TO SUPPLY AND INSTALL 32A TPN  ISOLATION USING 4X1C /10MM PVC CABLE +CPC | 16.00 | 2,200.00 | 35,200.00 |   Edit |   Delete |  |   | 
  |  | 6 | UPDATE SLD DRAWING  | 1.00 | 300.00 | 300.00 |   Edit |   Delete |  | 7 | MODIFY DB TO CATER ELECTRICAL WORK  | 1.00 | 3,500.00 | 3,500.00 |   Edit |   Delete |  | 8 | LEW ENDORSEMENT FOR DRAWING  | 1.00 | 800.00 | 800.00 |   Edit |   Delete |  | 9 | LEW ATTENDANCE FOR ONSITE TESTING  | 1.00 | 1,200.00 | 1,200.00 |   Edit |   Delete |  | 10 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL  | 16.00 | 1,200.00 | 19,200.00 |   Edit |   Delete |  |   | OUTDOOR DUCTED ELBOW . 
 **OUTDOOR LOCATION IS WITHIN THE UNIT ,DUCTING TO LEAD THE HOT AIR OUT OF THE BUILDING. 
 
  |  | 11 | SCISSOR LIFT BOOKING | 2.00 | 950.00 | 1,900.00 |   Edit |   Delete |  | 12 | REMARKS |   |   |   |   Edit |   Delete |  |   | 1) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
 2) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
 3) 10%FULL PAYMENT UPON JOB COMPLETED.
 4) EXCLUSION: WORKS NOT STATED ABOVE. |  | Total | 86.00 |   | 557,300.00 |  			 
		 |