| 
						No
					 | 
					
						Product
					 | 
					
						Quantity
					 | 
					
						Unit Price
					 | 
					
						Amount
					 | 
					
						Function
					 | 
				 
											
								| 
									1								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							 							
							
								| 
								 | 
								
																	 | 
							 
							
								| 
																		  
																	 | 
							 	
				| 2 | TO SUPPLY AND INSTALL WATE TARY FOR INDOOR UNIT  | 16.00 | 380.00 | 6,080.00 |   Edit |   Delete |  | 3 | TO SUPPLY AND INSTALL WATER TARY FOR OUTOOR  | 16.00 | 1,500.00 | 24,000.00 |   Edit |   Delete |  | 4 | DUCTING WORK  | 16.00 | 950.00 | 15,200.00 |   Edit |   Delete |  |   | 	TO SUPPLY LABOUR AND MATERIALS TO CONNECT DUCT WORK AND FILTER .
 
  |  | 5 | TO SUPPLY AND INSTALL 32A TPN  ISOLATION USING 4X1C /10MM PVC CABLE +CPC | 16.00 | 2,200.00 | 35,200.00 |   Edit |   Delete |  |   | 
  |  | 6 | UPDATE SLD DRAWING  | 1.00 | 300.00 | 300.00 |   Edit |   Delete |  | 7 | MODIFY DB TO CATER ELECTRICAL WORK  | 1.00 | 3,500.00 | 3,500.00 |   Edit |   Delete |  | 8 | LEW ENDORSEMENT FOR DRAWING  | 1.00 | 800.00 | 800.00 |   Edit |   Delete |  | 9 | LEW ATTENDANCE FOR ONSITE TESTING  | 1.00 | 1,200.00 | 1,200.00 |   Edit |   Delete |  | 10 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL  | 16.00 | 1,200.00 | 19,200.00 |   Edit |   Delete |  |   | OUTDOOR DUCTED ELBOW . 
 **OUTDOOR LOCATION IS WITHIN THE UNIT ,DUCTING TO LEAD THE HOT AIR OUT OF THE BUILDING. 
 
  |  | 11 | SCISSOR LIFT BOOKING | 2.00 | 950.00 | 1,900.00 |   Edit |   Delete |  | 12 | REMARKS |   |   |   |   Edit |   Delete |  |   | 1) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
 2) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
 3) 10%FULL PAYMENT UPON JOB COMPLETED.
 4) EXCLUSION: WORKS NOT STATED ABOVE. |  | Total | 86.00 |   | 107,380.00 |  			 
		 |