						No
					 | 
					
						Product
					 | 
					
						Quantity
					 | 
					
						Unit Price
					 | 
					
						Amount
					 | 
					
						Function
					 | 
				 
				| 1 | FOR L3 CU6 | 1.00 | 61,700.00 | 61,700.00 |   Edit |   Delete |  |   | TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL
 DAIKIN VRV A SERIES INVERTER R410A GAS 
 MODEL: RXQ44AMYMG(RXQ12AYMG+RXQ12AYMG+RXQ20AYMG)
 FCU-MODEL:FXMQ250MVE9 (WIRELESS DUCTED WITHOUT DRAIN PUMP)X4 -28.0KW
 FCU-MODEL:FXFQ50AVM (W) CASSETTE X2 (5.6KW)
 
  |  | 2 | FOR L2 SANCTUARY CU-8 | 1.00 | 48,900.00 | 48,900.00 |   Edit |   Delete |  |   | TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL
 MODEL:RXQ32AMYMG(RXQ14AYMG+RXQ18AYMG)
 FCU-MODEL:FXMQ200MVE9(WIRELESS DUCTED WITHOUT DRAIN PUMP)X4 (28.0KW)
 
  |  | 3 | FOR 2ND STOREY AND 3RD STOREY CU-3 | 1.00 | 80,900.00 | 80,900.00 |   Edit |   Delete |  |   | TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL
 MODEL:RXQ50AMYMG(RXQ14AYMG+RXQ18AYMG+RXQ18AYMG)
 FCU:FXMQ200MVE9(WIRELESS DUCTED WITHOUT DRAIN PUMP)X4 (28.0KW)
 FCU:FXFQ32AVM(W) CASSETTE X1 (3.6KW)
 FCU-FXFQ50AYM(W) CASSETTE X4 (5.6KW)
 
 **THE EXISTING COPPER PIPE AT THE RISER EXIT ON THE SECOND FLOOR WILL BE CUT AND RECONNECT TO THE NEW MAIN PIPING . AND ALL NECESSARY PARTS.
 TESTING $ COMMISSIONING APPLIED.
 **USE BAY PVC WATER PIPE 
 
 WARRANTY FOR NEW AIRCON
 *1 YEAR SPARE PARTS
 *5 YEARS COMPRESSOR
 
 **EXCLUDE AIRCON BRACKET FOR VRF
 **EXCLUDE SUBMISSION
 
  |  | 4 | TO SUPPLY AND INSTALL MAIN PIPE FOR CU6/CU8/CU3 | 3.00 | 4,650.00 | 13,950.00 |   Edit |   Delete |  |   | 
  |  | 5 | DUCTING WORK  | 12.00 | 1,340.00 | 16,080.00 |   Edit |   Delete |  |   | TO SUPPLY LABOUR AND MATERIALS TO CONNECT DUCT WORK . |  							
								| 
									6								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							 							
							
								| 
								 | 
								
																	 | 
							 
							
								| 
																		  
																	 | 
							 	
				| 7 | *CRANE BOOKING (IF ANY) $2800/1DEY | 1.00 | 2,800.00 | 2,800.00 |   Edit |   Delete |  | 8 | TO SUPPLY LABOUR DISMANTLE 3SET VRV A/C TAKE BACK, DISPOSE | 3.00 | 1,550.00 | 4,650.00 |   Edit |   Delete |  | 9 | REMARKS |   |   |   |   Edit |   Delete |  |   | 	1) 50% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
 2) 30% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
 3) 20%FULL PAYMENT UPON JOB COMPLETED.
 4) EXCLUSION: WORKS NOT STATED ABOVE. |  | Total | 22.00 |   | 228,980.00 |  			 
		 |