Kaili Aircond
Singapore


Online Billing Portal
Cloud Solutions Sdn Bhd
Vince : +6012 7040 900 ( watapps / wechat )
[email protected]

   File Attachement   Create Revised Copy
Customer Information
Branch Last Update SUN   
Name Quotation No Q
Running Reference : Q25/0324
Address Customer No
Address 2
Address 3
Address 4
Contact Tel Fax
Quotation Information
Date
    
Ref
Validity Delivery Terms
Subject
Currency Remark
      
Quotation Detail Information
No Product Quantity Unit Price Amount Function
1   
  
2FOR L2 SANCTUARY CU-81.0048,900.0048,900.00 Edit Delete
 TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL
MODEL:RXQ32AMYMG(RXQ14AYMG+RXQ18AYMG)
FCU-MODEL:FXMQ200MVE9(WIRELESS DUCTED WITHOUT DRAIN PUMP)X4 (28.0KW)

3FOR 2ND STOREY AND 3RD STOREY CU-31.0080,900.0080,900.00 Edit Delete
 TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL
MODEL:RXQ50AMYMG(RXQ14AYMG+RXQ18AYMG+RXQ18AYMG)
FCU:FXMQ200MVE9(WIRELESS DUCTED WITHOUT DRAIN PUMP)X4 (28.0KW)
FCU:FXFQ32AVM(W) CASSETTE X1 (3.6KW)
FCU-FXFQ50AYM(W) CASSETTE X4 (5.6KW)

**THE EXISTING COPPER PIPE AT THE RISER EXIT ON THE SECOND FLOOR WILL BE CUT AND RECONNECT TO THE NEW MAIN PIPING . AND ALL NECESSARY PARTS.
TESTING $ COMMISSIONING APPLIED.
**USE BAY PVC WATER PIPE

WARRANTY FOR NEW AIRCON
*1 YEAR SPARE PARTS
*5 YEARS COMPRESSOR

**EXCLUDE AIRCON BRACKET FOR VRF
**EXCLUDE SUBMISSION

4TO SUPPLY AND INSTALL MAIN PIPE FOR CU6/CU8/CU33.004,650.0013,950.00 Edit Delete
 
5DUCTING WORK 12.001,340.0016,080.00 Edit Delete
 TO SUPPLY LABOUR AND MATERIALS TO CONNECT DUCT WORK .
6TO SUPPLY AND INSTALL FILTER 12.00290.003,480.00 Edit Delete
7*CRANE BOOKING (IF ANY) $2800/1DEY1.002,800.002,800.00 Edit Delete
8TO SUPPLY LABOUR DISMANTLE 3SET VRV A/C TAKE BACK, DISPOSE3.001,550.004,650.00 Edit Delete
9REMARKS    Edit Delete
  1) 50% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 30% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 20%FULL PAYMENT UPON JOB COMPLETED.
4) EXCLUSION: WORKS NOT STATED ABOVE.
Total33.00 170,760.00