Kaili Aircond
Singapore


Online Billing Portal
Cloud Solutions Sdn Bhd
Vince : +6012 7040 900 ( watapps / wechat )
[email protected]

   File Attachement   Create Revised Copy
Customer Information
Branch Last Update Maiting   
Name Quotation No Q
Running Reference : Q25/0211
Address Customer No
Address 2
Address 3
Address 4
Contact Tel Fax
Quotation Information
Date
    
Ref
Validity Delivery Terms
Subject
Currency Remark
      
Quotation Detail Information
No Product Quantity Unit Price Amount Function
1TO SUPPLY LABOUR AND MATERIALS TO DISMANTLE 2 SET OF 4 HP CEILING CASSETTE UNIT 2.00200.00400.00 Edit Delete
2TO SUPPLY LABOUR MATERIALS TO INSTALL 2 SET 4 HP CEILING CASSETTE UNIT2.001,500.003,000.00 Edit Delete
 WITH REFRIGERATE COPPER PIPE, INSULATED PVC DRAINPIPE AND CONTROL WIRING.
RE: EQUIPMENT SUPPLY BY OTHER

3 TO SUPPLY LABOUR AND MATERIALS TO DISMANTLE AND INSTALL 1 SET 12HOUR CHANGEOVER CONTROL PANEL 1.001,200.001,200.00 Edit Delete
 INCLUDED TIMER SETTING AND WIRING .

4TO SUPPLY LABOUR AND MATERIALS TO DISMANTLE 10HP VRV DUCTED UNIT 1.00450.00450.00 Edit Delete
5TO SUPPLY LABOUR MATERIALS TO INSTALL1 NOS 10 HP VRV DUCTED UNIT 1.003,500.003,500.00 Edit Delete
 WITH REFRIGERATE COPPER PIPE, INSULATED PVC DRAINPIPE AND CONTROL WIRING.
RE: EQUIPMENT SUPPLY BY OTHER

6   
  
7TO SUPPLY LABOUR AND MATERIALS TO PROVIDE CHEMICAL OVERHAUL 1 NOS 10HP VRV INDOOR AND OUTDOOR UNIT 1.00550.00550.00 Edit Delete
8TO SUPPLY LABOUR MATERIAL AND TOOL TO RELOCATED 1 NOS CEILING CASSETTE UNIT WITH REFRIGERATED1.00750.00750.00 Edit Delete
 COPPER PIPE .

9TERM OF PAYMENT     Edit Delete
 1) 70% DEPOSIT TO CONFIRM JOB.
2) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 10%FULL PAYMENT UPON JOB COMPLETED.
10    Edit Delete
Total9.00 9,850.00