Kaili Aircond
Singapore
Online Billing Portal
Cloud Solutions Sdn Bhd
Vince : +6012 7040 900 ( watapps / wechat )
[email protected]
Home
Sales
Inventory
Reports
System
Logout
Job Schedule
Job Sheet
Quotation
Invoice ( Kaili Aircon )
Credit Note
Manual Delivery Order
Sales Return
Expense
Repair
Cash Sales ( Kaili Electrical )
Invoice ( Kaili Electrical )
File Attachement
Create Revised Copy
Customer Information
Branch
KAILI AIRCON PTE LTD
Kaili Aircon & Electrical Pte Ltd
Last Update
Maiting
Name
Quotation No
Q
Running Reference : Q25/0211
Address
Customer No
Address 2
Address 3
Address 4
Contact
Tel
Fax
Quotation Information
Date
Ref
Validity
Delivery
Terms
Subject
Currency
Remark
Quotation Detail Information
No
Product
Quantity
Unit Price
Amount
Function
1
2
TO SUPPLY LABOUR MATERIALS TO INSTALL 2 SET 4 HP CEILING CASSETTE UNIT
2.00
1,500.00
3,000.00
Edit
Delete
WITH REFRIGERATE COPPER PIPE, INSULATED PVC DRAINPIPE AND CONTROL WIRING.
RE: EQUIPMENT SUPPLY BY OTHER
3
TO SUPPLY LABOUR AND MATERIALS TO DISMANTLE AND INSTALL 1 SET 12HOUR CHANGEOVER CONTROL PANEL
1.00
1,200.00
1,200.00
Edit
Delete
INCLUDED TIMER SETTING AND WIRING .
4
TO SUPPLY LABOUR AND MATERIALS TO DISMANTLE 10HP VRV DUCTED UNIT
1.00
450.00
450.00
Edit
Delete
5
TO SUPPLY LABOUR MATERIALS TO INSTALL1 NOS 10 HP VRV DUCTED UNIT
1.00
3,500.00
3,500.00
Edit
Delete
WITH REFRIGERATE COPPER PIPE, INSULATED PVC DRAINPIPE AND CONTROL WIRING.
RE: EQUIPMENT SUPPLY BY OTHER
6
TO SUPPLY LABOUR AND MATERIALS TO PROVIDE CHEMICAL OVERHAUL 2 NOS 4HP CEILING CASSETTE UNIT
2.00
280.00
560.00
Edit
Delete
7
TO SUPPLY LABOUR AND MATERIALS TO PROVIDE CHEMICAL OVERHAUL 1 NOS 10HP VRV INDOOR AND OUTDOOR UNIT
1.00
550.00
550.00
Edit
Delete
8
TO SUPPLY LABOUR MATERIAL AND TOOL TO RELOCATED 1 NOS CEILING CASSETTE UNIT WITH REFRIGERATED
1.00
750.00
750.00
Edit
Delete
COPPER PIPE .
9
TERM OF PAYMENT
Edit
Delete
1) 70% DEPOSIT TO CONFIRM JOB.
2) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 10%FULL PAYMENT UPON JOB COMPLETED.
10
Edit
Delete
Total
9.00
10,010.00