						No
					 | 
					
						Product
					 | 
					
						Quantity
					 | 
					
						Unit Price
					 | 
					
						Amount
					 | 
					
						Function
					 | 
				 
				| 1 | 1 ST STOREYPLAN  | 2.00 | 2,550.00 | 5,100.00 |   Edit |   Delete |  |   | TO SUPPLY LABOUR AND MATERIALS TO INSTALL
 SINGLE -SPLIT SYUSTEM FOR CEILING CASSETTE 4.8KW
 
  INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
 WATER PIPE 16MM-20MM; CABLE TRAY AND ALL NECESSARY PARTS.
 TESTING & COMMISSIONING APPLIED.
 
  |  | 2 | 3RD STOREY PLAN | 11.00 | 3,200.00 | 35,200.00 |   Edit |   Delete |  |   | TO SUPPLY LABOUR AND MATERIALS TO INSTALL 
 SINGLE -SPLIT SYUSTEM (11.2KEW-CASSETTE FCU 11NOS 
 
 INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
 WATER PIPE 16MM-20MM; CABLE TRAY AND ALL NECESSARY PARTS.
 TESTING & COMMISSIONING APPLIED.
 **(INCLUDE PRESSURE TEST)
 
  |  | 3 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL | 1.00 | 3,080.00 | 3,080.00 |   Edit |   Delete |  |   | FOR 1 TO1 PRE COOL 
 
  |  | 4 | 	11TH STOREY PLAN | 3.00 | 1,800.00 | 5,400.00 |   Edit |   Delete |  |   | TO SUPPLY LABOUR AND MATERIALS TO INSTALL
 SINGLE-SPLIT SYSTEM WALL MOUNTED 2.5KW
 
 *WARRANTY FOR NEW AIRCON
 K-FLEX CLASS O
 ~22SWG COPPER PIPE
 
 **CRANE BOOKING (IF ANY) $2500/1DEY
 **SCISSOR LIFT BOOKING (IF ANY)$1500/ONE WEEK
 **EXCLUDE AIRCON BRACKET FOR VRV 
 
  |  | 5 | TO SUPPLY AND INSTALL S/STEEL BRACKET  | 17.00 | 320.00 | 5,440.00 |   Edit |   Delete |  |   | 
 
  |  | 6 | **CRANE BOOKING (IF ANY) $2500/1DEY | 1.00 | 2,500.00 | 2,500.00 |   Edit |   Delete |  							
								| 
									7								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							 							
							
								| 
								 | 
								
																	 | 
							 
							
								| 
																		  
																	 | 
							 	
				| 8 | REMARKS |   |   |   |   Edit |   Delete |  |   | 1) 50% DEPOSIT TO ORDER MATERIALS AND CONFIRM JOB.
 2) 45% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
 3) 5%FULL PAYMENT UPON JOB COMPLETED.
 4) EXCLUSION: WORKS NOT STATED ABOVE. |  | Total | 35.00 |   | 56,720.00 |  			 
		 |