|
No
|
Product
|
Quantity
|
Unit Price
|
Amount
|
Function
|
| 1 | TO SUPPLY LABOUR MATERIAL AND TOOLS TO DISMANTLE DOWN 1 SET SYSTEM 2 AIRCON . | 1.00 | 150.00 | 150.00 | Edit | Delete |
| | 2 NOS 9K BTU
|
| 2 | TO SUPPLY LABOUR MATERIAL AND TOOLS TO PROVIDED CHEMICAL OVERHAUL | 2.00 | 100.00 | 200.00 | Edit | Delete |
| | 2 NOS 9K FAN COIL UNIT.
|
| 3 | TO SUPPLY LABOUR AND MATERIALS TO DISMANTLE 1 SET 24K BTU SINGLE SPLIT | 1.00 | 150.00 | 150.00 | Edit | Delete |
| |
|
| 4 | TO SUPPLY LABOUR AND MATERIALS TO PROVIDE CHEMICAL OVERHAUL | 1.00 | 120.00 | 120.00 | Edit | Delete |
| | 1 NOS INDOOR FAN COIL UNIT (24000BTU)
|
| 5 | TO SUPPLY LABOUR MATERIALS TO INSTALL 1 SET MULTI SPLIT 1 TO 2 (9000BTU x2) | 1.00 | 980.00 | 980.00 | Edit | Delete |
| | WITH REFRIGERATE COPPER PIPE, INSULATED PVC, DRAINPIPE AND CONTROL WIRING.
RE: EQUIPMENT SUPPLY BY OTHER
|
|
6 |
|
|
|
|
|
|
|
|
|
| 7 | TO SUPPLY LABOUR MATERIALS AND TOOLS TO RELOCATED AND CHEMICAL OVERHAUL 1 NOS CASSETTE UNIT | 1.00 | 900.00 | 900.00 | Edit | Delete |
| |
|
| 8 | TO SUPPLY AND INSTALL 1 SET OF NEW MITSUBISHI ELECTRIC 24K BTU CASSETTE UNIT | 1.00 | 3,500.00 | 3,500.00 | Edit | Delete |
| | WITH REFRIGERATE COPPER PIPE, INSULATED PVC DRAINPIPE AND CONTROL WIRING.
MODEL: SUY M80VA / PLY M80EA - WIRED CONTROL
|
| 9 | TO SUPPLY AND INSTALL 3 SET OF NEW MITSUBISHI ELECTRIC 5HP DUCTED UNIT | 3.00 | 4,800.00 | 14,400.00 | Edit | Delete |
| | WITH REFRIGERATE COPPER PIPE, INSULATED PVC DRAINPIPE AND CONTROL WIRING.
MODEL:PUY M125VKA / PEY M125JAL2 - WIRELESS CONTROL
|
| 10 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL 3 NOS 4 WAY GRILL DUCTED WORK & FILTER | 3.00 | 250.00 | 750.00 | Edit | Delete |
| 11 | TO SUPPLY AND INSTALL 3 PCS WATER TRAY FOR DUCTED UNIT | 3.00 | 350.00 | 1,050.00 | Edit | Delete |
| 12 | TO SUPPLY AND INSTALL 3 PCS OUTDOOR SUPPORT BRACKET FOR 5HP DUCTED UNIT | 3.00 | 180.00 | 540.00 | Edit | Delete |
| 13 | | | | | Edit | Delete |
| |
TERM OF PAYMENT:
1) 50% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 30% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 20%FULL PAYMENT UPON JOB COMPLETED. |
| Total | 20.00 | | 22,740.00 |