						No
					 | 
					
						Product
					 | 
					
						Quantity
					 | 
					
						Unit Price
					 | 
					
						Amount
					 | 
					
						Function
					 | 
				
				| 1 | TO SUPPLY AND INSTALL 2 SET OF NEW MIDEA 18000 BTU SINGLE SPLIT  | 2.00 | 1,600.00 | 3,200.00 |   Edit |   Delete | 
|   | WITH NEW REFRIGERATE COPPER PIPE, INSULATED PVC DRAINPIPE AND CONTROL WIRING.
 MODEL: MPAG-1S18B / MPAG18B (18000 BTU)
 
  | 
| 2 | TO SUPPLY AND INSTALL 1 SET OF NEW MIDEA 45000 BTU CEILING CASSETTE UNIT | 1.00 | 4,000.00 | 4,000.00 |   Edit |   Delete | 
|   | WITH NEW REFRIGERATE COPPER PIPE, INSULATED PVC DRAINPIPE AND CONTROL WIRING.
 MODEL: MOU45-HVN32 / MCD45-HRFN32 (45000 BTU)
 
  | 
							
								| 
									3								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							
							
							
								| 
								 | 
								
																	 | 
							
							
								| 
																		  
																	 | 
							
	
				| 4 | TO SUPPLY LABOUR AND MATERIALS TO RELOCATE AND CHEMICAL OVERHAUL 1 NOS CASSETTE UNIT | 1.00 | 900.00 | 900.00 |   Edit |   Delete | 
|   | 
 
  | 
| 5 | TO SUPPLY AND INSTALL 2 SET OF NEW MIDEA 10HP CEILING DUCTED UNIT | 2.00 | 8,900.00 | 17,800.00 |   Edit |   Delete | 
|   | WITH NEW REFRIGERATE COPPER PIPE, INSULATED PVC DRAINPIPE AND CONTROL WIRING.
 MODEL: MHA-96CWDN1 / MOUC-96CDN-R (10HP)
 
  | 
| 6 | TO SUPPLY LABOUR MATERIALS AND TOOLS TO INSTALL 2 PCS WATER TRAY	 | 2.00 | 350.00 | 700.00 |   Edit |   Delete | 
| 7 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL 2 NOS 4 WAY GRILL DUCTED WORK & FILTER	 | 2.00 | 750.00 | 1,500.00 |   Edit |   Delete | 
| 8 | 	TO SUPPLY LABOUR AND MATERIALS TO INSTALL CONTROL PANEL 12 HOURS TO HOUR | 1.00 | 1,200.00 | 1,200.00 |   Edit |   Delete | 
| 9 | TO SUPPLY AND INSTALL 2 PCS OUTDOOR SUPPORT BRACKET FOR 10HP DUCTED UNIT	 | 2.00 | 200.00 | 400.00 |   Edit |   Delete | 
| 10 |  |   |   |   |   Edit |   Delete | 
|   | 
 
 
 
 
 
 TERM OF PAYMENT:
 1) 50% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
 2) 30% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
 3) 20%FULL PAYMENT UPON JOB COMPLETED. | 
| Total | 13.00 |   | 29,700.00 |