| 
						No
					 | 
					
						Product
					 | 
					
						Quantity
					 | 
					
						Unit Price
					 | 
					
						Amount
					 | 
					
						Function
					 | 
				
				| 1 | TO SUPPLY LABOUR MATERIAL AND TOOLS TO DISMANTLE DOWN 1 SET  SYSTEM 2 AIRCON .  | 1.00 | 150.00 | 150.00 |   Edit |   Delete | 
| 2 | TO SUPPLY LABOUR MATERIAL AND TOOLS TO PROVIDED CHEMICAL OVERHAUL  | 2.00 | 100.00 | 200.00 |   Edit |   Delete | 
|   | 2 NOS 9K FAN COIL UNIT . 
 
  | 
| 3 | TO SUPPLY LABOUR AND MATERIALS TO DISMANTLE 1 SET  24K BTU SINGLE SPLIT | 1.00 | 150.00 | 150.00 |   Edit |   Delete | 
|   | AIRCON SYSTEM  | 
| 4 | TO SUPPLY LABOUR AND MATERIALS TO PROVIDE CHEMICAL OVERHAUL  | 1.00 | 120.00 | 120.00 |   Edit |   Delete | 
|   | 1 NOS INDOOR FAN COIL UNIT (24000BTU)
 
  | 
| 5 | TO SUPPLY LABOUR AND MATERIALS TO DISMANTLE 1 SET 5HP CEILING CASSETTE UNIT | 1.00 | 150.00 | 150.00 |   Edit |   Delete | 
|   | 
  | 
| 6 | TO SUPPLY LABOUR AND MATERIALS TO PROVIDE CHEMICAL OVERHAUL | 1.00 | 200.00 | 200.00 |   Edit |   Delete | 
|   | 1 NOS 5HP CEILING CASSETTE UNIT
 
  | 
| 7 | TO SUPPLY LABOUR MATERIALS TO INSTALL 1 SET MULTI SPLIT 1 TO 2 (9000BTU x2) | 1.00 | 980.00 | 980.00 |   Edit |   Delete | 
|   | WITH REFRIGERATE COPPER PIPE, INSULATED PVC, DRAINPIPE AND CONTROL WIRING.
 RE: EQUIPMENT SUPPLY BY OTHER
 
  | 
| 8 | TO SUPPLY LABOUR MATERIALS TO INSTALL 1 SET SINGLE SPLIT 24000BTU  | 1.00 | 800.00 | 800.00 |   Edit |   Delete | 
|   | WITH REFRIGERAYE COPPER PIPE INSULATED PVC, DRIANPIPE AND CONTROL WIRING.
 RE: EQUIPMENT SUPPLY BY OTHER
 
  | 
| 9 | TO SUPPLY LABOUR MATERIALS TO INSTALL 1 SET 5HP CEILING CASSETTE UNIT | 1.00 | 1,300.00 | 1,300.00 |   Edit |   Delete | 
|   | WITH REFRIGERATE COPPER PIPE, INSULATED PVC DRAINPIPE AND CONTROL WIRING.
 RE: EQUIPMENT SUPPLY BY OTHER
 
  | 
| 10 | TO SUPPLY LABOUR MATERIALS AND TOOLS TO RELOCATED AND CHEMICAL OVERHAUL 1 NOS CASSETTE UNIT | 1.00 | 900.00 | 900.00 |   Edit |   Delete | 
							
								| 
									11								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							
							
							
								| 
								 | 
								
																	 | 
							
							
								| 
																		  
																	 | 
							
	
				| 12 | TO SUPPLY LABOUR MATERIALS AND TOOLS TO INSTALL 2 PCS WATER TRAY | 2.00 | 350.00 | 700.00 |   Edit |   Delete | 
| 13 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL 2 NOS 4 WAY GRILL DUCTED WORK & FILTER | 2.00 | 750.00 | 1,500.00 |   Edit |   Delete | 
| 14 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL CONTROL PANEL 12 HOURS TO HOUR | 1.00 | 1,200.00 | 1,200.00 |   Edit |   Delete | 
| 15 | TO SUPPLY AND INSTALL 2 PCS OUTDOOR SUPPORT BRACKET FOR 10HP DUCTED UNIT | 2.00 | 200.00 | 400.00 |   Edit |   Delete | 
| 16 |  |   |   |   |   Edit |   Delete | 
|   | 
 
 
 
 
 
 TERM OF PAYMENT:
 1) 50% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
 2) 30% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
 3) 20%FULL PAYMENT UPON JOB COMPLETED. | 
| Total | 18.00 |   | 8,750.00 |