No
|
Product
|
Quantity
|
Unit Price
|
Amount
|
Function
|
1 | TO SUPPLY LABOUR MATERIAL AND TOOLS TO DISMANTLE DOWN 1 SET SYSTEM 2 AIRCON . | 1.00 | 150.00 | 150.00 | Edit | Delete |
2 | TO SUPPLY LABOUR MATERIAL AND TOOLS TO PROVIDED CHEMICAL OVERHAUL | 2.00 | 100.00 | 200.00 | Edit | Delete |
| 2 NOS 9K FAN COIL UNIT .
|
3 | TO SUPPLY LABOUR AND MATERIALS TO DISMANTLE 1 SET 24K BTU SINGLE SPLIT | 1.00 | 150.00 | 150.00 | Edit | Delete |
| AIRCON SYSTEM |
4 | TO SUPPLY LABOUR AND MATERIALS TO PROVIDE CHEMICAL OVERHAUL | 1.00 | 120.00 | 120.00 | Edit | Delete |
| 1 NOS INDOOR FAN COIL UNIT (24000BTU)
|
5 | TO SUPPLY LABOUR AND MATERIALS TO DISMANTLE 1 SET 5HP CEILING CASSETTE UNIT | 1.00 | 150.00 | 150.00 | Edit | Delete |
|
|
6 |
|
|
|
|
|
|
|
7 | TO SUPPLY LABOUR MATERIALS TO INSTALL 1 SET MULTI SPLIT 1 TO 2 (9000BTU x2) | 1.00 | 980.00 | 980.00 | Edit | Delete |
| WITH REFRIGERATE COPPER PIPE, INSULATED PVC, DRAINPIPE AND CONTROL WIRING.
RE: EQUIPMENT SUPPLY BY OTHER
|
8 | TO SUPPLY LABOUR MATERIALS TO INSTALL 1 SET SINGLE SPLIT 24000BTU | 1.00 | 800.00 | 800.00 | Edit | Delete |
| WITH REFRIGERAYE COPPER PIPE INSULATED PVC, DRIANPIPE AND CONTROL WIRING.
RE: EQUIPMENT SUPPLY BY OTHER
|
9 | TO SUPPLY LABOUR MATERIALS TO INSTALL 1 SET 5HP CEILING CASSETTE UNIT | 1.00 | 1,300.00 | 1,300.00 | Edit | Delete |
| WITH REFRIGERATE COPPER PIPE, INSULATED PVC DRAINPIPE AND CONTROL WIRING.
RE: EQUIPMENT SUPPLY BY OTHER
|
10 | TO SUPPLY LABOUR MATERIALS AND TOOLS TO RELOCATED AND CHEMICAL OVERHAUL 1 NOS CASSETTE UNIT | 1.00 | 900.00 | 900.00 | Edit | Delete |
11 | TO SUPPLY AND INSTALL 2 SET MIDEA CEILING DUCTED 10HP | 2.00 | 8,900.00 | 17,800.00 | Edit | Delete |
| WITH REFRIGERATE COPPER PIPE, INSULATED DRAINPIPE AND CONTROL WIRING.
MODEL: MHA-96CWDN1 / MOUC-96CDN1-R
|
12 | TO SUPPLY LABOUR MATERIALS AND TOOLS TO INSTALL 2 PCS WATER TRAY | 2.00 | 350.00 | 700.00 | Edit | Delete |
13 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL 2 NOS 4 WAY GRILL DUCTED WORK & FILTER | 2.00 | 750.00 | 1,500.00 | Edit | Delete |
14 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL CONTROL PANEL 12 HOURS TO HOUR | 1.00 | 1,200.00 | 1,200.00 | Edit | Delete |
15 | TO SUPPLY AND INSTALL 2 PCS OUTDOOR SUPPORT BRACKET FOR 10HP DUCTED UNIT | 2.00 | 200.00 | 400.00 | Edit | Delete |
16 | | | | | Edit | Delete |
|
TERM OF PAYMENT:
1) 50% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 30% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 20%FULL PAYMENT UPON JOB COMPLETED. |
Total | 19.00 | | 26,350.00 |