Kaili Aircond
Singapore
Online Billing Portal
Cloud Solutions Sdn Bhd
Vince : +6012 7040 900 ( watapps / wechat )
[email protected]
Home
Sales
Inventory
Reports
System
Logout
Job Schedule
Job Sheet
Quotation
Invoice ( Kaili Aircon )
Credit Note
Manual Delivery Order
Sales Return
Expense
Repair
Cash Sales ( Kaili Electrical )
Invoice ( Kaili Electrical )
File Attachement
Create Revised Copy
Customer Information
Branch
Kaili Aircon Pte Ltd
Kaili Aircon & Electrical Pte Ltd
Last Update
Maiting
Name
Quotation No
Q
Running Reference : Q24/0910
Address
Customer No
Address 2
Address 3
Address 4
Contact
Tel
Fax
Quotation Information
Date
Ref
Validity
Delivery
Terms
Subject
Currency
Remark
Quotation Detail Information
No
Product
Quantity
Unit Price
Amount
Function
1
TO SUPPLY AND INSTALL 1 SETS OF NEW DAIKIN 3 PHASE VRV S WITH 3 NOS INDOOR DUCTED UNIT C/W NEW
1.00
12,655.00
12,655.00
Edit
Delete
REFRIGERATED COPPER PIPE PVC CONDENSATE WATER PIPE AND SYSTEM TRANSMISSION WIRING.
*TO SUPPLY LABOUR AND TOOLS TO DISMANTLE ONE LOT OF EXISTING USED / FAULTY AIRCON SYSTEM EQUIPMENT
MODEL : RSUQ7AYMG(3PH) / FXMQ40PAVE + FXMQ50PAVE + FXMQ63PAVE (WIRELESS REMOTE CONTROL )
2
TO SUPPLY AND INSTALL 1 SETS OF NEW DAIKIN 3 PHASE VRV S WITH 3 NOS INDOOR DUCTED UNIT C/W NEW
1.00
12,650.00
12,650.00
Edit
Delete
REFRIGERATED COPPER PIPE PVC CONDENSATE WATER PIPE AND SYSTEM TRANSMISSION WIRING.
*TO SUPPLY LABOUR AND TOOLS TO DISMANTLE ONE LOT OF EXISTING USED / FAULTY AIRCON SYSTEM EQUIPMENT
MODEL : RSUQ7AYMG(3PH) / FXMQ50PAVE + FXMQ63PAVE x 2 (WIRELESS REMOTE CONTROL )
3
TO SUPPLY AND INSTALL 2 NOS SPECIAL MAKE OUTDOOR SUPPORT BRACKET .
2.00
250.00
500.00
Edit
Delete
4
TO SUPPLY AND INSTALL SUPPLY AND RETURN DUCT WITH PLENUM BOX MATERIAL USED; PU FOAM. INCLUDE FILTER ., ABS GRILL WITH SINGLE D , FLEXIBLE FOR 6 NOS INDOOR DUCTED UNIT .
5
TO SUPPLY AND INSTALL 6 PCS WATER TRAY FOR DUCTED UNIT .
6.00
200.00
1,200.00
Edit
Delete
6
TERM OF PAYMENT
Edit
Delete
1) 50% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 40% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 10%FULL PAYMENT UPON JOB COMPLETED.
4) EXCLUSION: WORKS NOT STATED ABOVE
Total
10.00
27,005.00