| 
						No
					 | 
					
						Product
					 | 
					
						Quantity
					 | 
					
						Unit Price
					 | 
					
						Amount
					 | 
					
						Function
					 | 
				 
				| 1 | TO SUPPLY LABOUR MATERIAL AND TOOLS TO DISMANTLE DOWN 6 SETS CEILING CASSETTE UNIT .  | 6.00 | 150.00 | 900.00 |   Edit |   Delete |  | 2 | TO SUPPLY AND INSTALL 3 SETS NEW REFRIGERATED COPPER PIPE , INSULATED PVC DRAIN PIPE AND CONTROL  | 3.00 | 1,900.00 | 5,700.00 |   Edit |   Delete |  |   | WIRING FOR EXISTING CASSETTE UNIT .  |  | 3 | TO SUPPLY AND INSTALL 5 NOS NEW STAINLESS STEEL OUTDOOR SUPPORT BRACKET  | 5.00 | 180.00 | 900.00 |   Edit |   Delete |  | 4 | TO SUPPLY LABOUR AND MATERIALS TO PROVIDE CHEMICAL OVERHAUL FOR 3 NOS INDOOR CASSETTE UNIT .  | 3.00 | 750.00 | 2,250.00 |   Edit |   Delete |  | 5 | TO SUPPLY LABOUR AND MATERIALS TO  INSTALL 3 NOS INDOOR FAN COIL UNIT SUPPORT BRACKET .  | 3.00 | 120.00 | 360.00 |   Edit |   Delete |  | 6 | TO SUPPLY AND INSTALL 1 LOT OF NEW FABRICATION KEAD DUCTING . MATERIAL IN USE : PU FOAM . | 1.00 | 4,200.00 | 4,200.00 |   Edit |   Delete |  | 7 | TO SUPPLY AND INSTALL 2 PCS UV LIGHT .  | 1.00 | 900.00 | 900.00 |   Edit |   Delete |  							
								| 
									8								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							 							
							
								| 
								 | 
								
																	 | 
							 
							
								| 
																		  
																	 | 
							 	
				| 9 | TO SUPPLY AND INSTALL 1 NOS OF 2.0KW BOOT FAN  | 1.00 | 1,850.00 | 1,850.00 |   Edit |   Delete |  | 10 | TO SUPPLY AND INSTALL 1 NOS OF CONTROL PANEL WITH VSD .  | 1.00 | 1,200.00 | 1,200.00 |   Edit |   Delete |  | 11 | TO SUPPLY AND INSTALL 2 SETS OF RECON 5HP CEILING CASSETTE UNIT C/W PIPING .  | 2.00 | 2,750.00 | 5,500.00 |   Edit |   Delete |  | 12 | TERM OF PAYMENT  |   |   |   |   Edit |   Delete |  |   | 1) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
 2) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
 3) 10%FULL PAYMENT UPON JOB COMPLETED.
 4) EXCLUSION: WORKS NOT STATED ABOVE |  | Total | 26.00 |   | 23,760.00 |  			 
		 |