				| 1 | TO SUPPLY AIRCON  LABOUR AND MATERIALS TO INSTALL | 4.00 | 29,440.00 | 117,760.00 |   Edit |   Delete |  |   | LG INVERTER VRV  SYSTEM CEILING DUCTED 1TO3 /4SET 
 MODEL:ARUN300LTe5 /ARNU96GB8A4 x 3
 FOR PROPOSED WORKSHOP-B
 
 
  |  | 2 | 	TO SUPPLY LABOUR AND MATERIALS TO INSTALL MAIN PIPE | 4.00 | 2,800.00 | 11,200.00 |   Edit |   Delete |  |   | 
 
  |  | 3 | 	DUCT WORK | 12.00 | 5,800.00 | 69,600.00 |   Edit |   Delete |  |   | 	TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS.
 
  |  | 4 | TO SUPPLY AND INSTALL WATER TRAY FOR DUCTED FCU  | 12.00 | 350.00 | 4,200.00 |   Edit |   Delete |  |   | 
 
  |  | 5 | 	TO SUPPLY AND INSTALLFILTER  FOR DUCTED FCU | 12.00 | 280.00 | 3,360.00 |   Edit |   Delete |  |   | 
 
  |  | 6 | TO SUPPLY AIRCON  LABOUR AND MATERIALS TO INSTALL | 1.00 | 24,500.00 | 24,500.00 |   Edit |   Delete |  |   | LG INVERTER VRV SYSTEM
 ARUN160LTE5 
 ARNU42GTAB4 x 2 CASSETTE FCU 
 ARNU24GSKN4 x 3 WALL FCU 
 FOR OFFICE AND SERVER RM/FOC/MDF 
 
  |  | 7 | TO SUPPLY AIRCON  LABOUR AND MATERIALS TO INSTALL | 1.00 | 30,100.00 | 30,100.00 |   Edit |   Delete |  |   | LG INVERTER VRV SYSTEM
 ARUN200LTE5 
 ARNU42GTAB4 x 3  CASSETTE FCU 
 ARNU24GSKN4 x 3  WALL FCU 
 FOR OFFICE AND SERVER RM/FOC/MDF 
 
 INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
 WATER PIPE 16MM-20MM; CABLE AND ALL NECESSARY PARTS.
 TESTING $ COMMISSIONING APPLIED.
 
 K-FLEX CLASS O
 ~22SWG COPPER PIPE
 
 *WARRANTY FOR NEW AIRCON
 ~1 YEAR SPARE PARTS
 ~5 YEARS COMPRESSOR |  | 8 | 	TO SUPPLY LABOUR AND MATERIALS TO INSTALL MAIN PIPE | 2.00 | 3,800.00 | 7,600.00 |   Edit |   Delete |  |   | 
 
  |  | 9 | 	CRANE BOOKING (IF ANY) $1800/1DAY | 1.00 | 1,800.00 | 1,800.00 |   Edit |   Delete |  |   | 
 
 
  |  | 10 | CRC - SYSTEM  | 1.00 | 2,800.00 | 2,800.00 |   Edit |   Delete |  |   | 	*EXCLUDE
 ~AIRCON BRACKET
 ~SCISSOR LIFT BOOKING.
 ~DRAWING AND ENDORSEMENT .
 
  |  							
								| 
									11								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							 							
							
								| 
								 | 
								
																	 | 
							 
							
								| 
																		  
																	 | 
							 	