						No
					 | 
					
						Product
					 | 
					
						Quantity
					 | 
					
						Unit Price
					 | 
					
						Amount
					 | 
					
						Function
					 | 
				
				| 1 | TO SUPPLY AIRCON  LABOUR AND MATERIALS TO INSTALL | 1.00 | 58,800.00 | 58,800.00 |   Edit |   Delete | 
|   | DAIKIN INVERTER VRV 
 RXQ32AMYMG(14+18)
 FXFMQ125PAVE  DUCTED FCU*2 FOR DINING /LIVING 
 FXMQ63PAVE (W) DUCTED FCU *1 FOR FAMIL ROOM 
 FXMQ50PAVE(W) DUCTED FCU X*2 FOR BEDROOM1&2
 FXMQ63PAVE (W) DUCTED FCU X1 FOR FAMIL ROOM 1
 FXMQ80PAVE (W)  DUCTED FCU *1 FOR MASTER BEDROOM
 FXMQ32PAVE (W) DUCTED FCU *1 FOR W/N 
 FXMQ63PAVE(W)DUCTED FCU*3 FOR LEVEL3 
 
  | 
| 2 | DUCTED WORK FOR MODEL 125 | 2.00 | 4,200.00 | 8,400.00 |   Edit |   Delete | 
|   | 	TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS.
 FOR DINING AND LEVING 
 
  | 
| 3 | DUCTED WORK FOR MODE L63 | 1.00 | 2,200.00 | 2,200.00 |   Edit |   Delete | 
|   | 	TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS.
 FOR LIFT IN FRONT OF THE DOOR 
 
  | 
| 4 | LEVEL2 | 1.00 | 3,200.00 | 3,200.00 |   Edit |   Delete | 
|   | 	DUCTED WORK FOR MODEL80 
 TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS .
 FOR MASTERBEDROOM 
 
  | 
| 5 | DUCTED WORK FOR MODEL 32/ 63/50/50 | 4.00 | 2,200.00 | 8,800.00 |   Edit |   Delete | 
|   | TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS .
 BEDROOM1/BEDROOM2
 FAMILY ROOM 
 MASTER LOCKER ROOM
 
  | 
| 6 | LEVEL3 | 3.00 | 2,200.00 | 6,600.00 |   Edit |   Delete | 
|   | 	DUCTED WORK FOR MODEL50
 TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS .
 BEDROOM3/BEDROOM4
 FAMILY ROOM 2
 
  | 
							
								| 
									7								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							
							
							
								| 
								 | 
								
																	 | 
							
							
								| 
																		  
																	 | 
							
	
				| 8 | TO SUPPLY LABOUR AND FABRICATE MAIN DUCT ONLY   | 1.00 | 800.00 | 800.00 |   Edit |   Delete | 
|   | FOR LEVEL1 KITCHEN ,MATERIAL USED; PU FOAM.
 
 
 **INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
 WATER PIPE 16MM-25MM; CABLE AND ALL NECESSARY PARTS.
 **INCLUDE CONCEAL
 TESTING $ COMMISSIONING APPLIED.
 
 *WARRANTY FOR NEW AIRCON
 *1 YEAR SPARE PARTS
 *5 YEARS COMPRESSOR
 
 **CRANE BOOKING (IF ANY) $1900/1DEY
 **EXCLUDE AIRCON BRACKET
 **FILTER $250.00+ WATER TRAY $280 (IF ANY) | 
| 9 | REMARKS |   |   |   |   Edit |   Delete | 
|   | 1) AIRCON C/W WIRELESS REMOTE CONTROLLER
 2) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
 3) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
 4) FULL PAYMENT UPON JOB COMPLETED.
 5) EXCLUSION: WORKS NOT STATED ABOVE. | 
| Total | 13.00 |   | 88,800.00 |