| 
						No
					 | 
					
						Product
					 | 
					
						Quantity
					 | 
					
						Unit Price
					 | 
					
						Amount
					 | 
					
						Function
					 | 
				 
				| 1 | TO SUPPLY AND INSTALL 1 SETS OF NEW DAIKIN 3 PHASE VRV WITH 9 SETS OF INDOOR FAN COIL UNIT AC SYSTEM | 1.00 | 34,800.00 | 34,800.00 |   Edit |   Delete |  |   | WITH USE BACK EXISTING INSULATED REFRIGERATED COPPER PIPING, PVC CONDENSATE WATER PIPE AND SYSTEM TRANSMISSION WIRING
 
 BRAND : DAIKIN VRV (WIRELESS) 
 MODEL : RXQ16AYMG(3PH) x 1SET 
 FXAQ32AVM (WALL MOUNTED) X 1
 FXAQ50AVM (WALL MOUNTED) X 4
 FXFQ63AVM (C/CASSETTE) X 2
 FXFQ32AVM (C/CASSETTE) X 1
 FXMQ50PAVE (C/DUCTED) X1
  |  | 2 | TO SUPPLY AND INSTALL 1 SETS OF NEW DAIKIN 3 PHASE VRV WITH 6 SETS OF DUCTED CONNECTION INDOOR | 1.00 | 29,500.00 | 29,500.00 |   Edit |   Delete |  |   | FAN COIL UNIT AC SYSTEM WITH USED BACK EXISTING INSULATED REFRIGERATED COPPER PIPING, PVC CONDENSATE WATER PIPE AND SYSTEM TRANSMISSION WIRING
 
 BRAND : DAIKIN VRV (WIRELESS)
 MODELRXQ16AYMG(3PH)/
 FXMQ63PAVE (C/DUCTED) X 3
 FXMQ32PAVE (C/DUCTED) X1
 FXMQ100PAVE (C/DUCTED) X1
 FXMQ125PAVE (C/DUCTED) X1
 
 
  |  | 3 | TO SUPPLY AND INSTALL 1 LOT OF NEW FABRIATED MAIN DUCT TO CONNECT WITH 7 NOS NEW DUCTED INDOOR UNIT. | 1.00 | 11,000.00 | 11,000.00 |   Edit |   Delete |  |   | MATERIAL IN USE: PU FOAM C/W FLEXIBLE DUCT, SUPPLY AND RETURN GRILL NECESSARY |  							
								| 
									4								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							 							
							
								| 
								 | 
								
																	 | 
							 
							
								| 
																		  
																	 | 
							 	
				| 5 | CRANE BOOKING  | 1.00 | 2,500.00 | 2,500.00 |   Edit |   Delete |  | 6 | EQUIPMENT WARRANTY :  |   |   |   |   Edit |   Delete |  |   | * COMPRESSOR 5 YEAR AND ALL PARTS IS 1YEAR (EQUIPMENT GUARANTEE BY AGENT TO THEIR TERM AND CONDITIONS ) 
 * WORKMANSHIP IS 1 YEAR  |  | 7 | TERM OF PAYMENT  |   |   |   |   Edit |   Delete |  |   | 1) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
 2) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
 3) 10%FULL PAYMENT UPON JOB COMPLETED.
 4) EXCLUSION: WORKS NOT STATED ABOV |  | Total | 4.00 |   | 77,800.00 |  			 
		 |