				| 1 | LEVEL1 | 1.00 | 1,600.00 | 1,600.00 |   Edit |   Delete |  |   | TO SUPPLY LABOUR AND MATERIALS TO INSTALL
 36000BTU CEILING CASSETTE 
 FOR DINING  |  | 2 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL | 1.00 | 1,700.00 | 1,700.00 |   Edit |   Delete |  |   | 42000BTU CEILING DUCTED 
 FOR LIVING 
 
   |  | 3 | DUCTED WORK FOR LIVING  | 1.00 | 3,800.00 | 3,800.00 |   Edit |   Delete |  |   | TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS.
 
  |  | 4 | LEVEL  | 1.00 | 3,000.00 | 3,000.00 |   Edit |   Delete |  |   | 	TO SUPPLY LABOUR AND MATERIALS TO INSTALL
 1TO4 WALL MOUNTED 
 18000BTU FOR MASTED BEDROOM 
 9000BTU FOR WAIK IN CLOSET 
 12000BTU FOR BEDROOM3
 12000BTU FOR BEDROO1 
 
  |  | 5 | LEVEL 2 AND ATTLC | 1.00 | 2,450.00 | 2,450.00 |   Edit |   Delete |  |   | TO SUPPLY LABOUR AND MATERIALS TO INSTALL
 1TO3 WALL MOUNTED 
 18000BTU FOR BEDROOM2
 12000BTU FOR STUDY ROOM
 24000BTU FOR HAME GYM 
 
  |  | 6 | CORING  | 3.00 | 250.00 | 750.00 |   Edit |   Delete |  							
								| 
									7								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							 							
							
								| 
								 | 
								
																	 | 
							 
							
								| 
																		  
																	 | 
							 	
				| 8 | REMARKS |   |   |   |   Edit |   Delete |  |   | )50% DEPOSIT AFTER PIPE LAYING AND INSTALL.
 2)40% SECOND PAYMENT UPON AIRCON ARRIVAL BEFORE INSTALLATION
 3)10% FULL PAYMENT UPON JOB COMPLETION. |  | Total | 8.00 |   | 13,300.00 |  			 
		 |