| 
						No
					 | 
					
						Product
					 | 
					
						Quantity
					 | 
					
						Unit Price
					 | 
					
						Amount
					 | 
					
						Function
					 | 
				
				| 1 | TO SUPPLY AIRCON  LABOUR AND MATERIALS TO INSTALL | 4.00 | 14,800.00 | 59,200.00 |   Edit |   Delete | 
|   | TOSHIBA INVERTER VRF 1TO5 9000BTU WALL MOUNTED 
 MODEL:MCY-MAP0601TP-SG x1/MMK-UP0091HP-E x5
 x4SET 
 
 FOR 6 SAMALL ROOM /
 7 MIDDLE ROOM AND 5BIG ROOM /2VIP ROOM 
 
 INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
 WATER PIPE 16MM-20MM; CABLE TRAY AND ALL NECESSARY PARTS.
 TESTING $ COMMISSIONING APPLIED.
 
 
  | 
| 2 | MV EXHAUST AIR SYSTEM  | 1.00 | 9,800.00 | 9,800.00 |   Edit |   Delete | 
|   | SUPPLY AND INSTALL G20 GALVANIZED NEW EXHAUST DUCT WORK COMPLETE 
 WITH 20 NOS. OF NEW EXHAUST AIR GRILLES WITH VCD FOR 20NOS KTV ROOM C/W BRACKETS SUPPORT .
 a)A) G I EAD SIZE:L40M xW400mm x H300mm-2set
 
  | 
| 3 | B) EAG c/W CD SIZE:W250mmX H200mm-20nos | 20.00 | 170.00 | 3,400.00 |   Edit |   Delete | 
							
								| 
									4								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							
							
							
								| 
								 | 
								
																	 | 
							
							
								| 
																		  
																	 | 
							
	
				| 5 | TO SUPPLY AND INSTALL 1NOS EXHAUST CONTROL PANEL  | 1.00 | 4,500.00 | 4,500.00 |   Edit |   Delete | 
|   | 1NOS EXHAUST CONTROL PANEL ,2NOS 1.5KW VSD ,2TIMER 7DAY 24HOURS AND INTERLOCKING SYSTEM GAS, FIRE SUSPENSION AND UBER LIGHT OR AIR CLEANER .
 
  | 
| 6 | TO SUPPLY LABOUR TO EXTEND EXISTING FLEXBLE TO ALL 20 ROOM  | 20.00 | 380.00 | 7,600.00 |   Edit |   Delete | 
|   | C/W SUPPLY AIR GRILL. AND ALL NECESSARY PARTS.
 
  | 
| 7 | TO SUPPLY LABOUR TO EXTEND EXISTING FLEXBLE DUCT TO ALL 20 ROOM | 20.00 | 50.00 | 1,000.00 |   Edit |   Delete | 
|   |  C/W ROUND DIFFUSER.AND ALL NECESSARY PARTS. | 
| 8 | REMARKS |   |   |   |   Edit |   Delete | 
|   | 	1) 70% DEPOSIT TO CONFIRM JOB AND ORDER MATERIALS.
 2) BALANCE UPON JOB COMPLETION.
 3) EXCLUSION: WORKS NOT STATED IN THIS QUOTATION. | 
| Total | 66.00 |   | 85,500.00 |