				| 1 | FIRST FLOOR | 1.00 | 85,800.00 | 85,800.00 |   Edit |   Delete | 
|   | 	TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL
 DAIKIN INVERTER VRV 1V R410A 
 CU-MODEL:RXQ56AMYMG(18+18+20)
 FCU-FXMQ140PAVE(W) -CEILING DUCTED 
 FOR DRYKIT/LV/DINING/VOID  *6
 FCU-FXMQ125PAVE(W)-CEILING DUCTED FOR KTV*2
 FCU-FXMQ80PAVE(W)-CEILING DUCTED FOR MAJONG/WET KIT *2
 FXMQ32PAVE(W)-CEILING DUCTED FOR MAID ROOM*1
 FCU-FXMQ50PAVE(W)-CEILING DUCTED FOR PATION*2
 TOTAL FCUX13NOS 
 
  | 
| 2 | DUCT WORK  FOR DRYKIT/LV/DINING VOID *6 | 6.00 | 4,800.00 | 28,800.00 |   Edit |   Delete | 
|   | TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS AND ALL NECESSARY PARTS
 
  | 
| 3 | DUCT WORK FOR  KTV *2 | 2.00 | 4,200.00 | 8,400.00 |   Edit |   Delete | 
|   | 	TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS AND ALL NECESSARY PARTS.
 
  | 
| 4 | DUCT WORK FOR MAJONG/WET KIT *2 | 2.00 | 3,800.00 | 7,600.00 |   Edit |   Delete | 
|   | TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS.
 
  | 
| 5 | 	DUCT WORK FOR/ PATION*2 | 2.00 | 3,400.00 | 6,800.00 |   Edit |   Delete | 
|   | TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS. | 
| 6 | DUCT WORK FOR  MAID ROOM*1 | 1.00 | 2,800.00 | 2,800.00 |   Edit |   Delete | 
|   | TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS AND ALL NECESSARY PARTS
 
  | 
| 7 | SECOND FLOOR  | 1.00 | 43,500.00 | 43,500.00 |   Edit |   Delete | 
|   | DAIKIN INVERTER VRV IV R410A
 CU-MODEL:RXQ24AMYMG(12+12)
 FCU-FXMQ100PAVE(W)-CEILING DUCTED FOR SMALL HALL/B5 *2
 FCU-FXMQ63PAVE(W)-CEILING DUCTED FOR SMALL /B3 *2
 FCU-FXMQ80PAVE(W)-CEILING DUCTED FOR MASTED BED*1/B2 *2=3
 FCU-FXMQ50PAVE(W)-CEILING DUCTED FOR B4 *1
 TOTAL FCU X8NOS
 
  | 
| 8 | DUCT WORK FOR SMALL HALL/B5 *2 | 2.00 | 5,200.00 | 10,400.00 |   Edit |   Delete | 
|   | TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS AND ALL NECESSARY PARTS.  
 
  | 
| 9 | 	DUCT WORK FOR  SMALL /B3 *2 | 2.00 | 4,200.00 | 8,400.00 |   Edit |   Delete | 
|   | TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS AND ALL NECESSARY PARTS. 
 
  | 
| 10 | DUCT WORK FOR MASTED BED*1/B2 *2 | 3.00 | 3,400.00 | 10,200.00 |   Edit |   Delete | 
|   | 	TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS AND ALL NECESSARY PARTS
 
  | 
| 11 | 	DUCT WORK FOR B4 *1 | 1.00 | 3,400.00 | 3,400.00 |   Edit |   Delete | 
|   | 	TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS AND ALL NECESSARY PARTS
 
 
 **INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
 WATER PIPE 16MM-25MM; CABLE AND ALL NECESSARY PARTS.
 **INCLUDE CONCEAL
 TESTING $ COMMISSIONING APPLIED.
 
 *WARRANTY FOR NEW AIRCON
 *1 YEAR SPARE PARTS
 *5 YEARS COMPRESSOR
 
 **CRANE BOOKING (IF ANY) $1900/1DEY
 **EXCLUDE AIRCON BRACKET
 **FILTER $250.00 (IF ANY)
  | 
							
								| 
									12								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							
							
							
								| 
								 | 
								
																	 | 
							
							
								| 
																		  
																	 | 
							
	
				| 13 | 	REMARKS |   |   |   |   Edit |   Delete | 
|   | 1) AIRCON C/W WIRELESS REMOTE CONTROLLER
 2) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
 3) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
 4) FULL PAYMENT UPON JOB COMPLETED.
 5) EXCLUSION: WORKS NOT STATED ABOVE. | 
| Total | 23.00 |   | 216,100.00 |