1 | FIRST FLOOR | 1.00 | 85,800.00 | 85,800.00 | Edit | Delete |
| TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL
DAIKIN INVERTER VRV 1V R410A
CU-MODEL:RXQ56AMYMG(18+18+20)
FCU-FXMQ140PAVE(W) -CEILING DUCTED
FOR DRYKIT/LV/DINING/VOID *6
FCU-FXMQ125PAVE(W)-CEILING DUCTED FOR KTV*2
FCU-FXMQ80PAVE(W)-CEILING DUCTED FOR MAJONG/WET KIT *2
FXMQ32PAVE(W)-CEILING DUCTED FOR MAID ROOM*1
FCU-FXMQ50PAVE(W)-CEILING DUCTED FOR PATION*2
TOTAL FCUX13NOS
|
2 | DUCT WORK FOR DRYKIT/LV/DINING VOID *6 | 6.00 | 4,800.00 | 28,800.00 | Edit | Delete |
| TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS AND ALL NECESSARY PARTS
|
3 | DUCT WORK FOR KTV *2 | 2.00 | 4,200.00 | 8,400.00 | Edit | Delete |
| TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS AND ALL NECESSARY PARTS.
|
4 | DUCT WORK FOR MAJONG/WET KIT *2 | 2.00 | 3,800.00 | 7,600.00 | Edit | Delete |
| TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS.
|
5 | DUCT WORK FOR/ PATION*2 | 2.00 | 3,400.00 | 6,800.00 | Edit | Delete |
| TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS. |
6 |
|
|
|
|
|
|
|
7 | SECOND FLOOR | 1.00 | 43,500.00 | 43,500.00 | Edit | Delete |
| DAIKIN INVERTER VRV IV R410A
CU-MODEL:RXQ24AMYMG(12+12)
FCU-FXMQ100PAVE(W)-CEILING DUCTED FOR SMALL HALL/B5 *2
FCU-FXMQ63PAVE(W)-CEILING DUCTED FOR SMALL /B3 *2
FCU-FXMQ80PAVE(W)-CEILING DUCTED FOR MASTED BED*1/B2 *2=3
FCU-FXMQ50PAVE(W)-CEILING DUCTED FOR B4 *1
TOTAL FCU X8NOS
|
8 | DUCT WORK FOR SMALL HALL/B5 *2 | 2.00 | 5,200.00 | 10,400.00 | Edit | Delete |
| TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS AND ALL NECESSARY PARTS.
|
9 | DUCT WORK FOR SMALL /B3 *2 | 2.00 | 4,200.00 | 8,400.00 | Edit | Delete |
| TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS AND ALL NECESSARY PARTS.
|
10 | DUCT WORK FOR MASTED BED*1/B2 *2 | 3.00 | 3,400.00 | 10,200.00 | Edit | Delete |
| TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS AND ALL NECESSARY PARTS
|
11 | DUCT WORK FOR B4 *1 | 1.00 | 3,400.00 | 3,400.00 | Edit | Delete |
| TO SUPPLY LABOUR AND FABRICATE MAIN DUCT AND MATERIAL USED; PU FOAM.C/W SUPPLY GRILLS RETURN GRILLS AND ALL NECESSARY PARTS
**INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
WATER PIPE 16MM-25MM; CABLE AND ALL NECESSARY PARTS.
**INCLUDE CONCEAL
TESTING $ COMMISSIONING APPLIED.
*WARRANTY FOR NEW AIRCON
*1 YEAR SPARE PARTS
*5 YEARS COMPRESSOR
**CRANE BOOKING (IF ANY) $1900/1DEY
**EXCLUDE AIRCON BRACKET
**FILTER $250.00 (IF ANY)
|
12 | EXHAUST FAN FOR BATH FIRST FLOOR | 2.00 | 1,400.00 | 2,800.00 | Edit | Delete |
| TO SUPPLY LABOUR AND FABRICATE MAIN DUCT 150X150 ,MATERIAL USED; PU FOAM. INCLUDE 2NOS EXHAUST AIR GRIL |
13 | REMARKS | | | | Edit | Delete |
| 1) AIRCON C/W WIRELESS REMOTE CONTROLLER
2) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
3) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
4) FULL PAYMENT UPON JOB COMPLETED.
5) EXCLUSION: WORKS NOT STATED ABOVE. |
Total | 24.00 | | 216,100.00 |