No
|
Product
|
Quantity
|
Unit Price
|
Amount
|
Function
|
1 | TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL | 1.00 | 4,200.00 | 4,200.00 | Edit | Delete | | CHILLED WATER CEILING DUCTED FAN COIL 24000BTU WITH CHILLER PU PIPING INCLUDED DRAIN PIPE, SWANGER; MOTORISED VALVE; GATE VALVE AND BALANCING VALVE |
2 |
|
|
|
|
|
|
|
3 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL JACKETING PIPE | 1.00 | 1,900.00 | 1,900.00 | Edit | Delete | 4 | TO SUPPLY AND INSTALL CHILLED WATER PIPE 200FT | 1.00 | 7,500.00 | 7,500.00 | Edit | Delete | 5 | TO SUPPLY AND INSTALL COINTROL PANEL BOX | 1.00 | 2,200.00 | 2,200.00 | Edit | Delete | | TO SUPPLY AND INSTALL TIMER (12 TO 12/HOUR) | 6 | TO SUPPLY AND INSTALL CUSTOMIZED FILTER | 1.00 | 250.00 | 250.00 | Edit | Delete | 7 | TO SUPPLY AND INSTALL CUSTOMIZED WATER TRAY | 1.00 | 280.00 | 280.00 | Edit | Delete | 8 | *WATER ANALYSIS REPORT AND TEST WATER VOLUME. *ANDŁ¨WASH PIPE) | 1.00 | 1,200.00 | 1,200.00 | Edit | Delete | 9 | TO SUPPLY AND ANISTALL ANTI DUST /ANTI ODOUR FILTER | 2.00 | 120.00 | 240.00 | Edit | Delete | | FOR POLISHING ROOM | 10 | DRAWING WITH CALCULATION AND ENDORSEMENT.(PE) | 1.00 | 1,800.00 | 1,800.00 | Edit | Delete | 11 | TERM OF PAYMENT | | | | Edit | Delete | | 1) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 10%FULL PAYMENT UPON JOB COMPLETED.
4) EXCLUSION: WORKS NOT STATED ABOVE.
| Total | 10.00 | | 19,570.00 |
|