1 | 1ST STOREY | 1.00 | 30,100.00 | 30,100.00 | Edit | Delete | | TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL
MITSUBISHI INVERTER VRF
CU 1-1 MODEL:PUCY-P400YKD
-PLFY-P80VEM-PA(W)-FCU 1-1-1 - CEILING CASSETTE - FORMAL LIVING
-PLFY-P63VEM-PA(W)-FCU 1-1-2 - CEILING CASSETTE - FORMAL LIVING
-PLFY-P63VEM-PA(W)-FCU 1-1-3 = CEILING CASSETTE FOR
DRY KITCHEN, DINING & INFORMAL L-IVING
-PLFY-P80VEM-PA(W)-FCU 1-1-4 = CEILING CASSETTE -FOR
DRY KITCHEN, DINING & INFORMAL LIVING
-PLFY-P63VEM-PA(W)-FCU 1-1-5 = CEILING CASSETTE FOR
DRY KITCHEN, DINING & INFORMAL LIVING
-PKFY-P50VLM-ETH(W)-FCU 1-1-6 = WALL MOUNTED FOR GUEST ROOM
TOTAL 6NOS FCU
| 2 | 2ND STOREY PLAN | 1.00 | 32,600.00 | 32,600.00 | Edit | Delete | | TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL
MITSUBISHI INVERTER VRF
CU 2-1 MODEL:PUCY-P400YKD
-PKFY-P63VKM-E(W) FCU 2-1-1 = WALL MOUNTED FOR BEDROOM 1
-PKFY-P63VKM-E(W) FCU 2-1-2 = WALL MOUNTED FOR BEDROOM 2
-PLFY-P80VEM-PA(W) FCU 2-1-3 = CEILING CASSETTE
FOR MASTER BEDROOM
-PKFY-P25VLM-ETH(W) FCU 2-1-4 = WALL MOUNTED FOR WALK IN WARDROBE
-PLFY-P50VEM-PA(W) FCU 2-1-5 = CEILING CASSETTE FOR FAMILY HALL
-PLFY-P63VEM-PA(W) FCU 2-1-6 = CEILING CASSETTE FOR FAMILY HALL
-PLFY-P63VEM-PA(W) FCU 2-1-7 = CEILING CASSETTEV FOR FAMILY HALL
TOTAL 7NOS FCU
|
3 |
|
|
|
|
|
|
|
4 | EAF1-1 FOR 1ST STOREY SWIMMING POOL PUMP ROOM | 1.00 | 1,400.00 | 1,400.00 | Edit | Delete | | TO SUPPLY LABOUR AND MATERIALS TO INSTALL IN LINE FAN 180CMH
FABRICATE EXHAUST DUCT , MATERIAL USED; PU FOAM,C/W FOUR WAY GRILL, FLEXIBLE AND NECESSARY ACCESSRIES
| 5 | KEAP1-1 FOR 1ST STOREY WET KIITCHEN | 1.00 | 1,800.00 | 1,800.00 | Edit | Delete | | TO SUPPLY LABOUR AND MATERIALS TO INSTALL IN LINE FAN 200CMH
FABRICATE EXHAUST DUCT , MATERIAL USED; PU FOAM,C/W FOUR WAY GRILL, FLEXIBLE AND NECESSARY ACCESSRIES
| 6 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL MAIN PIPING C/W COPPER FOR VRV . | 3.00 | 2,100.00 | 6,300.00 | Edit | Delete | 7 | **CRANE BOOKING (IF ANY) $1900/1DEY | 1.00 | 1,900.00 | 1,900.00 | Edit | Delete | 8 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL PU INSULATION PIPE | 1.00 | 1,300.00 | 1,300.00 | Edit | Delete | | FOR TYPICAL FLOOR TRAP . | 9 | REMARKS | | | | Edit | Delete | | 1)40% DEPOSIT AFTER PIPE LAYING AND INSTALL.
2)50% SECOND PAYMENT UPON AIRCON ARRIVAL BEFORE INSTALLATION
3)10% FULL PAYMENT UPON JOB COMPLETION.
4) DELIVERY: EX-STOCK PRIOR TO SALE, OTHERWISE 1 TO 3 MONTHS FROM DATE OF PURCHASE ORDER RECEIVED. | Total | 9.00 | | 75,400.00 |
|