Kaili Aircond
Singapore


Online Billing Portal
Cloud Solutions Sdn Bhd
Vince : +6012 7040 900 ( watapps / wechat )
[email protected]

   File Attachement   Create Revised Copy
Customer Information
Branch Last Update admin   
Name Quotation No Q
Running Reference : Q23/1215
Address Customer No
Address 2
Address 3
Address 4
Contact Tel Fax
Quotation Information
Date
    
Ref
Validity Delivery Terms
Subject
Currency Remark
      
Quotation Detail Information
No Product Quantity Unit Price Amount Function
1   
  
22ND STOREY PLAN 1.0032,600.0032,600.00 Edit Delete
 TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL
MITSUBISHI INVERTER VRF
CU 2-1 MODEL:PUCY-P400YKD
-PKFY-P63VKM-E(W) FCU 2-1-1 = WALL MOUNTED FOR BEDROOM 1
-PKFY-P63VKM-E(W) FCU 2-1-2 = WALL MOUNTED FOR BEDROOM 2
-PLFY-P80VEM-PA(W) FCU 2-1-3 = CEILING CASSETTE
FOR MASTER BEDROOM
-PKFY-P25VLM-ETH(W) FCU 2-1-4 = WALL MOUNTED FOR WALK IN WARDROBE
-PLFY-P50VEM-PA(W) FCU 2-1-5 = CEILING CASSETTE FOR FAMILY HALL
-PLFY-P63VEM-PA(W) FCU 2-1-6 = CEILING CASSETTE FOR FAMILY HALL
-PLFY-P63VEM-PA(W) FCU 2-1-7 = CEILING CASSETTEV FOR FAMILY HALL
TOTAL 7NOS FCU

3ATTIC1.0031,700.0031,700.00 Edit Delete
 TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL
MITSUBISHI INVERTER VRF
CU A-1 MODEL:PUCY-P400YKD
PLFY-P63VEM-PA(W) FCU A-1-1 = CEILING CASSETTE FOR FAMILY HALL
PKFY-P63VKM-E(W) FCU A-1-2 = WALL MOUNTED FOR FAMILY HALL
PKFY-P50VLM-ETH(W) FCU A-1-3 = WALL MOUNTED FOR STUDY
PKFY-P50VLM-ETH(W) FCU A-1-4 = WALL MOUNTED FOR BEDROOM 3
PKFY-P63VKM-E(W) FCU A-1-5 = WALL MOUNTED FOR EXERCISE ROOM
PKFY-P63VKM-E(W) FCU A-1-6 = WALL MOUNTED FOR EXERCISE ROOM
PKFY-P50VLM-ETH(W)FCU A-1-7 = WALL MOUNTED FOR STORE
TOTAL 7NOS FCU

*INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
WATER PIPE 16MM-25MM; CABLE TRAY AND ALL NECESSARY PARTS.
**INCLUDE CONCEAL
TESTING $ COMMISSIONING APPLIED.

*WARRANTY FOR NEW AIRCON
*1 YEAR SPARE PARTS
*5 YEARS COMPRESSOR

**EXCLUDE AIRCON BRACKET
**EXCLUDE DRAWING AND SUBMISSION.

4EAF1-1 FOR 1ST STOREY SWIMMING POOL PUMP ROOM1.001,400.001,400.00 Edit Delete
 TO SUPPLY LABOUR AND MATERIALS TO INSTALL IN LINE FAN 180CMH
FABRICATE EXHAUST DUCT , MATERIAL USED; PU FOAM,C/W FOUR WAY GRILL, FLEXIBLE AND NECESSARY ACCESSRIES

5KEAP1-1 FOR 1ST STOREY WET KIITCHEN1.001,800.001,800.00 Edit Delete
 TO SUPPLY LABOUR AND MATERIALS TO INSTALL IN LINE FAN 200CMH
FABRICATE EXHAUST DUCT , MATERIAL USED; PU FOAM,C/W FOUR WAY GRILL, FLEXIBLE AND NECESSARY ACCESSRIES

6 TO SUPPLY LABOUR AND MATERIALS TO INSTALL MAIN PIPING C/W COPPER FOR VRV .3.002,100.006,300.00 Edit Delete
7 **CRANE BOOKING (IF ANY) $1900/1DEY1.001,900.001,900.00 Edit Delete
8TO SUPPLY LABOUR AND MATERIALS TO INSTALL PU INSULATION PIPE1.001,300.001,300.00 Edit Delete
 FOR TYPICAL FLOOR TRAP .
9 REMARKS    Edit Delete
 1)40% DEPOSIT AFTER PIPE LAYING AND INSTALL.
2)50% SECOND PAYMENT UPON AIRCON ARRIVAL BEFORE INSTALLATION
3)10% FULL PAYMENT UPON JOB COMPLETION.
4) DELIVERY: EX-STOCK PRIOR TO SALE, OTHERWISE 1 TO 3 MONTHS FROM DATE OF PURCHASE ORDER RECEIVED.
Total9.00 77,000.00