| 1 | TO SUPPLY AND INSTALL ONE LOT OF NEW FABRICATION KEAD DUCTING | 1.00 | 4,950.00 | 4,950.00 | Edit | Delete | | | (10 METER | | 2 | TO SUPPLY AND INSTALL 2 PCS UV LIGHT . ( 300 METER) | 1.00 | 800.00 | 800.00 | Edit | Delete | | 3 | TO SUPPLY AND INSTALL ONE PCS OF NEW KITCHEN HOOD (2400 x 600 ) | 1.00 | 1,750.00 | 1,750.00 | Edit | Delete | | | WITH NO RETURN DAMPER | | 4 | TO SUPPLY AND INSTALL ONE PCS OF NEW KITCHEN HOOD 1200 x 600 ) | 1.00 | 1,150.00 | 1,150.00 | Edit | Delete | | | WITH NO RETURN DAMPER | | 5 | TO SUPPLY AND INSTALL ONE LOT OF NEW FABRICATION MAIN DUCT WITH 4 NOS GI GRILL . | 1.00 | 4,900.00 | 4,900.00 | Edit | Delete | | 6 | TO SUPPLY AND INSTALL ONE LOT OF NEW FABRICATION MAIN DUCT WITH 3 NOS GI GRILL | 1.00 | 4,500.00 | 4,500.00 | Edit | Delete | | 7 | TO SUPPLY LABOUR AND MATERIALS TO RELOCATED 1 PCS WATER PIPE | 1.00 | 180.00 | 180.00 | Edit | Delete |
|
8 |
|
|
|
|
|
|
|
|
|
| 9 | TERM OF PAYMENT : | | | | Edit | Delete | | | 1) 50% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2)) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) FULL PAYMENT UPON JOB COMPLETED. | | Total | 7.00 | | 18,230.00 |
|