No
|
Product
|
Quantity
|
Unit Price
|
Amount
|
Function
|
1 | TO SUPPLY LABOUR AND MATERIAL TO INSTALL 2 SETS OF NEW DAIKIN 17HP VRV AIRCON SYSTEM C/W | 2.00 | 36,000.00 | 72,000.00 | Edit | Delete | | 4 NOS INDOOR DUCTED UNIT AND 1 LOT OF VRV REFRIGERATE COPPER PIPING ,REFNET JOINT , CONDENSATION WATER PVC PIPE , SYSTEM TRANSMISSION WIRING AND OUTDOOR SUPPORT BRACKET .
LOCATION : PXB ROOM
RE: EQUIPMENT SUPPLY BY OWNER . | 2 | TO SUPPLY LABOURS AND TOOLS TO INSTALL 8 NOS OF NEW CHILLER WATER FAN COIL UNIT . | 8.00 | 4,200.00 | 33,600.00 | Edit | Delete | | LOCATION : LEVEL 10 , LEVEL 17 , LEVEL 9
RE: EQUIPMENT SUPPLY BY OWNER | 3 | TO HACKING HOLE IN WALL FOR CHILLER WATER PIPING INSTALLATION AND PLASTER AND PAINT | 3.00 | 4,500.00 | 13,500.00 | Edit | Delete | | BACK + MAKE GOOD AFFECTED AREA UPON COMPLETION . | 4 | TO SUPPLY LABOUR AND MATERIALS TO FLUSHING OF NEW INSTALLED FLUSHING CHILL WATER PIPING . | 8.00 | 3,000.00 | 24,000.00 | Edit | Delete |
5 |
|
|
|
|
|
|
|
6 | TO SUPPLY LABOUR AND INSTALL ONE LOT OF MAIN DUCT C/W NECESSARY 8 NOS MV FAN AND GRILLES . | 1.00 | 72,000.00 | 72,000.00 | Edit | Delete | | LOCATION : PATCH ROOM 1 ,2 ,3 ,4 | 7 | TERM OF PAYMENT : | | | | Edit | Delete | | 2) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
3) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
4) FULL PAYMENT UPON JOB COMPLETED.
5) EXCLUSION: WORKS NOT STATED ABOVE. | Total | 22.00 | | 215,100.00 |
|