No
|
Product
|
Quantity
|
Unit Price
|
Amount
|
Function
|
1 | TO SUPPLY LABOUR AND MATERIAL TO INSTALL 2 SETS OF NEW DAIKIN 17HP VRV AIRCON SYSTEM C/W | 2.00 | 36,000.00 | 72,000.00 | Edit | Delete | | 4 NOS INDOOR DUCTED UNIT AND 1 LOT OF VRV REFRIGERATE COPPER PIPING ,REFNET JOINT , CONDENSATION WATER PVC PIPE , SYSTEM TRANSMISSION WIRING AND OUTDOOR SUPPORT BRACKET .
LOCATION : PXB ROOM
RE: EQUIPMENT SUPPLY BY OWNER . |
2 |
|
|
|
|
|
|
|
3 | TO HACKING HOLE IN WALL FOR CHILLER WATER PIPING INSTALLATION AND PLASTER AND PAINT | 3.00 | 4,500.00 | 13,500.00 | Edit | Delete | | BACK + MAKE GOOD AFFECTED AREA UPON COMPLETION . | 4 | TO SUPPLY LABOUR AND MATERIALS TO FLUSHING OF NEW INSTALLED FLUSHING CHILL WATER PIPING . | 8.00 | 3,000.00 | 24,000.00 | Edit | Delete | 5 | TO SUPPLY AND INSTALL ONE LOT OF CHILLED WATER PIPING FOR NEW CHILLED WATER FAN COIL UNIT C/W | 1.00 | 76,500.00 | 76,500.00 | Edit | Delete | | NECESSARY ACCESSORIES INCLUDED BALANCING VALVE , MOTORIZED VALVE , GATE VALVE , TA MODULATOR VALVE
LOCATION : PATCH ROOM 1 ,2 ,3 ,4 | 6 | TO SUPPLY LABOUR AND INSTALL ONE LOT OF MAIN DUCT C/W NECESSARY 8 NOS MV FAN AND GRILLES . | 1.00 | 72,000.00 | 72,000.00 | Edit | Delete | | LOCATION : PATCH ROOM 1 ,2 ,3 ,4 | 7 | TERM OF PAYMENT : | | | | Edit | Delete | | 2) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
3) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
4) FULL PAYMENT UPON JOB COMPLETED.
5) EXCLUSION: WORKS NOT STATED ABOVE. | Total | 15.00 | | 258,000.00 |
|