Quotation Detail Information
No Product Quantity Unit Price Amount Function
1OPTION 11.0050,950.0050,950.00 Edit Delete
 LEVEL1
TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL
DAIKIN INVERTER VRV IV R410 GAS 4-5TICK
CU-RXUQ30AMYMG-SG
FXMQ100PAVE (W)FCU -CEILING DUCTED 4HP *2 FOR PACKING ROOM
FXFQ140AVM (W) FCU-CASSETTE TYPE 6HP *2 FOR PRODUCTION
FXMQ100PAVE (W) FCU-DUCTED 36K *1 FOR MILLING ROOM
FXMQ63PAVE (W) FCU-DUCTING 24K *1 FOR PREMIX ROOM
FXFQ63AVM(W)FCU CASSETTE 24K FOR RAD ROOM
FXFQ32AVM(W)FCU CASSETTE 12K *1 FOR RAD ROOM
2 TO SUPPLY LABOUR AND MATERIALS TO INSTALL MAIN PIPING C/W COPPER FOR LEVEL1.1.002,200.002,200.00 Edit Delete
3LEVEL 21.0011,180.0011,180.00 Edit Delete
 TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL
DAIKIN INVERTER VRV IV R410GAS 4-5TICK
CEILING CASSETTE TYPR
CURXUQ6AYMG/FXFQ63AVM(W) *1/FXFQ80AVM(w)*1
FOR GENERAL OFFICE/RECEPTION

**INCLUDE INSULATION MAIN PIPE 1" THK (GAS);1/2" THK (LIQUID); TO FCU 3/4" THK;
WATER PIPE 16MM-25MM; CABLE TRAY AND ALL NECESSARY PARTS.
TESTING $ COMMISSIONING APPLIED.
4TO SUPPLY AIRCON LABOUR AND MATERIALS TO INSTALL1.003,980.003,980.00 Edit Delete
 DAIKIN INVERTER 1TO3 WALL 5TICK
MKM10VVMG/CTKM25VVMG*2/CTKM35VVMG*1
9000BTU X2

*WARRANTY FOR NEW AIRCON
*1 YEAR SPARE PARTS
*5 YEARS COMPRESSOR
12000BTU X1
5 TO SUPPLY AND INSTALL OUTDOOR BACKET FOR LEVEL22.00180.00360.00 Edit Delete
6 SCISSOR LIFT BOOKING $8501.00850.00850.00 Edit Delete
7 TO SUPPLY AND INSTALL EXHAUST AIR FOR LEVEL1 1.004,200.004,200.00 Edit Delete
 MODEL:GCIL250
FABRICATE EXHAUST DUCT 1TO6 , MATERIAL USED; PU FOAM,C/W FOUR WAY GRILL FLEXIBLE AND NECESSARY ACCESSORIES
8   
  
9REMARKS    Edit Delete
  1) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 10%FULL PAYMENT UPON JOB COMPLETED.
4) EXCLUSION: WORKS NOT STATED ABOVE.
Total8.00 73,720.00