| 
						No
					 | 
					
						Product
					 | 
					
						Quantity
					 | 
					
						Unit Price
					 | 
					
						Amount
					 | 
					
						Function
					 | 
				
				| 1 | TO SUPPLY AND INSTALL FOUR SET OF NEW DAIKIN 10HP  VRV DUCTED SYSTEM  | 4.00 | 16,750.00 | 67,000.00 |   Edit |   Delete | 
|   | C/W NEW INSULATED REFRIGERATED PIPE .PVC DRAINAGE PIPE & SYSTEM CONTROL WIRING INCLUDED FABRICATE DUCT WORK AND 6 NOS OF NEW 4 WAY GRILLE (600 x 600)
 INSULATION FLEXIBLE . MATERIAL USED PU AND NECESSARY ACCESSORIES . 
 
 MODEL : RXQ10AYM / FXMQ250 | 
| 2 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL ONE SET OF NEW DAIKIN  SYSTEM 2 VRV AIRCON  | 1.00 | 13,000.00 | 13,000.00 |   Edit |   Delete | 
|   | SYSTEM C/W ONE LOT OF CONCEAL NEW INSULATED REFRIGERATED COPPERPIPE .PVC DRAINAGE PIPE & SYSTEM CONTROL WIRING .
 TO VACCUM & CHARGE IN GAS ON INSTALLED NEW AIRCON SYSTEM
 TEST & COMMISSIONING UPON COMPLETION .
 
 MODEL : RXMQ5AYM / FXFQ63 x 2  | 
| 3 | TO SUPPLY AND INSTALL 2 SETS OF NEW DAIKIN VRV SYSTEM 2 AIRCON  | 2.00 | 18,690.00 | 37,380.00 |   Edit |   Delete | 
|   | SYSTEM C/W ONE LOT OF CONCEAL NEW INSULATED REFRIGERATED COPPERPIPE .PVC DRAINAGE PIPE & SYSTEM CONTROL WIRING .
 TO VACCUM & CHARGE IN GAS ON INSTALLED NEW AIRCON SYSTEM
 TEST & COMMISSIONING UPON COMPLETION .
 
 MODEL : RXMQ06AYM  / FXFQ80 x 2 nos  | 
| 4 | TO SUPPLY AND INSTALL1 SETS OF NEW DAIKIN VRV SYSTEM 3  AIRCON  | 1.00 | 21,500.00 | 21,500.00 |   Edit |   Delete | 
|   | SYSTEM C/W ONE LOT OF CONCEAL NEW INSULATED REFRIGERATED COPPERPIPE .PVC DRAINAGE PIPE & SYSTEM CONTROL WIRING .
 TO VACCUM & CHARGE IN GAS ON INSTALLED NEW AIRCON SYSTEM
 TEST & COMMISSIONING UPON COMPLETION .
 
 MODEL : RXMQ6AYM 
 FXFQ63 x 1 nos 
 FXFQ50 x 2 nos  | 
| 5 | TO SUPPLY AND INSTALL ONE SET OF NEW DAIKIN SYSTEM 3 AIRCON . | 1.00 | 5,700.00 | 5,700.00 |   Edit |   Delete | 
|   | C/W ONE SET OF CONCEAL NEW INSULATED REFRIGERATED COPPER PIPE .PVC DRAINAGE PIPE & SYSTEM CONTROL WIRING .
 
 MODEL : MKM85VVMG 
 CTKS 35VVMG x 3 nos  | 
							
								| 
									6								 | 
								
									
																		  
									 	
								 | 
								
																	 | 
								
																	 | 
								
								 | 
							
							
							
								| 
								 | 
								
																	 | 
							
							
								| 
																		  
																	 | 
							
	
				| 7 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL 4 NOS WATER TRAY WITH AIR FILETR FOR 4 NOS DUCTED UNIT | 4.00 | 750.00 | 3,000.00 |   Edit |   Delete | 
| 8 | REMARK  |   |   |   |   Edit |   Delete | 
|   | SCISSOR LIFT (IF ANY ) $1200 / PER DAY
 CRANE MOBILE (IF ANY) $1500 / PER DAY | 
| 9 | REMARK  |   |   |   |   Edit |   Delete | 
|   | 1) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
 2) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
 3) 10%FULL PAYMENT UPON JOB COMPLETED.
 4) EXCLUSION: WORKS NOT STATED ABOVE. | 
| Total | 13.00 |   | 147,580.00 |