No
|
Product
|
Quantity
|
Unit Price
|
Amount
|
Function
|
1 | TO SUPPLY AND INSTALL FOUR SET OF NEW DAIKIN 10HP VRV DUCTED SYSTEM | 4.00 | 16,750.00 | 67,000.00 | Edit | Delete |
| C/W NEW INSULATED REFRIGERATED PIPE .PVC DRAINAGE PIPE & SYSTEM CONTROL WIRING INCLUDED FABRICATE DUCT WORK AND 6 NOS OF NEW 4 WAY GRILLE (600 x 600)
INSULATION FLEXIBLE . MATERIAL USED PU AND NECESSARY ACCESSORIES .
MODEL : RXQ10AYM / FXMQ250 |
2 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL ONE SET OF NEW DAIKIN SYSTEM 2 VRV AIRCON | 1.00 | 13,000.00 | 13,000.00 | Edit | Delete |
| SYSTEM C/W ONE LOT OF CONCEAL NEW INSULATED REFRIGERATED COPPERPIPE .PVC DRAINAGE PIPE & SYSTEM CONTROL WIRING .
TO VACCUM & CHARGE IN GAS ON INSTALLED NEW AIRCON SYSTEM
TEST & COMMISSIONING UPON COMPLETION .
MODEL : RXMQ5AYM / FXFQ63 x 2 |
3 | TO SUPPLY AND INSTALL 2 SETS OF NEW DAIKIN VRV SYSTEM 2 AIRCON | 2.00 | 18,690.00 | 37,380.00 | Edit | Delete |
| SYSTEM C/W ONE LOT OF CONCEAL NEW INSULATED REFRIGERATED COPPERPIPE .PVC DRAINAGE PIPE & SYSTEM CONTROL WIRING .
TO VACCUM & CHARGE IN GAS ON INSTALLED NEW AIRCON SYSTEM
TEST & COMMISSIONING UPON COMPLETION .
MODEL : RXMQ06AYM / FXFQ80 x 2 nos |
4 | TO SUPPLY AND INSTALL1 SETS OF NEW DAIKIN VRV SYSTEM 3 AIRCON | 1.00 | 21,500.00 | 21,500.00 | Edit | Delete |
| SYSTEM C/W ONE LOT OF CONCEAL NEW INSULATED REFRIGERATED COPPERPIPE .PVC DRAINAGE PIPE & SYSTEM CONTROL WIRING .
TO VACCUM & CHARGE IN GAS ON INSTALLED NEW AIRCON SYSTEM
TEST & COMMISSIONING UPON COMPLETION .
MODEL : RXMQ6AYM
FXFQ63 x 1 nos
FXFQ50 x 2 nos |
5 |
|
|
|
|
|
|
|
6 | TO SUPPLY AND INSTALL ONE SET OF NEW DAIKIN SYSTEM 2 AIRCON | 1.00 | 4,500.00 | 4,500.00 | Edit | Delete |
| C/W ONE SET OF CONCEAL NEW INSULATED REFRIGERATED COPPER PIPE .PVC DRAINAGE PIPE & SYSTEM CONTROL WIRING .
TO VACCUM & CHARGE IN GAS ON INSTALLED NEW AIRCON SYSTEM
TEST & COMMISSIONING UPON COMPLETION .
MODEL : MKM75VVMG
CTKS 35VVMG x2 nos |
7 | TO SUPPLY LABOUR AND MATERIALS TO INSTALL 4 NOS WATER TRAY WITH AIR FILETR FOR 4 NOS DUCTED UNIT | 4.00 | 750.00 | 3,000.00 | Edit | Delete |
8 | REMARK | | | | Edit | Delete |
| SCISSOR LIFT (IF ANY ) $1200 / PER DAY
CRANE MOBILE (IF ANY) $1500 / PER DAY |
9 | REMARK | | | | Edit | Delete |
| 1) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 10%FULL PAYMENT UPON JOB COMPLETED.
4) EXCLUSION: WORKS NOT STATED ABOVE. |
Total | 13.00 | | 146,380.00 |