Kaili Aircond
Singapore


Online Billing Portal
Cloud Solutions Sdn Bhd
Vince : +6012 7040 900 ( watapps / wechat )
[email protected]

   File Attachement   Create Revised Copy
Customer Information
Branch Last Update admin   
Name Quotation No Q
Running Reference : Q23/0331
Address Customer No
Address 2
Address 3
Address 4
Contact Tel Fax
Quotation Information
Date
    
Ref
Validity Delivery Terms
Subject
Currency Remark
      
Quotation Detail Information
No Product Quantity Unit Price Amount Function
1TO SUPPLY AND INSTALL FOUR SET OF NEW MIDEA 10HP VRV DUCTED SYSTEM 4.0011,150.0044,600.00 Edit Delete
 C/W NEW INSULATED REFRIGERATED PIPE .PVC DRAINAGE PIPE & SYSTEM CONTROL WIRING INCLUDED FABRICATE DUCT WORK AND 6 NOS OF NEW 4 WAY GRILLE (600 x 600)
INSULATION FLEXIBLE . MATERIAL USED PU AND NECESSARY ACCESSORIES .

MODEL: MHA-96CWDN1 / MOUC-96CDN1-R x 4 sets
2   
  
3TO SUPPLY LABOUR AND MATERIALS TO INSTALL TWO SET OF NEW MIDEA SYSTEM 2 VRV2.0012,500.0025,000.00 Edit Delete
 AIRCON SYSTEM C/W NEW INSULATED REFRIGERATED PIPE .PVC DRAINAGE PIPE & SYSTEM CONTROL WIRING

MODEL : MDV-D28Q4/N1-E(At) (x2) / MDV-V42WDHN1(AtB)

RE: Indent on FCU (6-8 weeks upon confirmation)
4TO SUPPLY LABOUR AND MATERIALS TO INSTALL ONE SET OF NEW MIDEA SYSTEM 3 VRV1.0010,500.0010,500.00 Edit Delete
 AIRCON SYSTEM C/W NEW INSULATED REFRIGERATED PIPE .PVC DRAINAGE PIPE & SYSTEM CONTROL WIRING

MODEL : MDV-D24Q4/N1-E(At) + MDV-D18Q4/N1-E(At) / MDV-V42WDHN1(AtB)
RE: INDENT ON FCU ( 6-8 WEEKS UPON CONFIRMATION
5TO SUPPLY AND INSTALL ONE SET OF NEW MIDEA SYSTEM 3 AIRCON . 1.004,700.004,700.00 Edit Delete
 C/W NEW REFRIGERATED COPPER PIPE , PVC DRAIN PIPE AND CONTROL WIRING
MODEL : MSEID-12k (x3) / MAE-3M25E
6TO SUPPLY AND INSTALL ONE SET OF NEW MIDEA SYSTEM 2 AIRCON .1.003,700.003,700.00 Edit Delete
 C/W NEW REFRIGERATED COPPER PIPE , PVC DRAIN PIPE AND CONTROL WIRING

MODEL : MSEID-12 k(x) x2 MAE-3M25E
7TO SUPPLY LABOUR AND MATERIALS TO INSTALL 4 NOS WATER TRAY WITH AIR FILETR FOR 4 NOS DUCTED UNIT 4.00750.003,000.00 Edit Delete
8CRANE MOBLE (IF ANY ) $1500 / PER DAY    Edit Delete
 SCISSOR LIFT (IF ANY ) $1200 / PER DAY
9REMARK     Edit Delete
 1) 70% DEPOSIT TO ORDER AIRCON AND CONFIRM JOB.
2) 20% PROGRESSIVE CLAIM WHEN AIRCON ARRIVE.
3) 10%FULL PAYMENT UPON JOB COMPLETED.
4) EXCLUSION: WORKS NOT STATED ABOVE.
Total13.00 91,500.00